Program update history
Official sources are checked before changes are published. Funding checks and full eligibility reviews are tracked separately.
Monthly reviews cover the catalog and search all 50 states and DC for new opportunities. Weekly checks focus on funding status and deadlines. Exceptions remain visible while other verified updates proceed.
State research · 51 jurisdictions covered
Every jurisdiction has a dated finding. Programs may be closed, restricted to particular applicants, or require further confirmation. No current program identified means none was found in the sources checked.
AlaskaOct 5, 2026
No applicable private Class 8 truck acquisition/lease program was found in the AEA VW/DERA watch pages and official Alaska discovery searches. AEA VW allocations target buses, charging and prime-power engines; state DERA is exclusively rural prime power.
Scoped finding only: both watch pages successfully read, plus Alaska/AEA official-domain discovery. Does not establish statewide absence of funding; local, tribal and utility opportunities were not exhaustively surveyed.
AlabamaOct 5, 2026
ADECA VW 2026 truck replacement applications remain due October 6, 2026 at 11:59 p.m. Central. Private electric projects require at least 25% match.
Reopened official watch page and guide and searched official announcements. REL lease structure, current configuration/vendor eligibility, retention and precise stacking remain unresolved. No exhaustive municipality/utility review.
ArkansasOct 5, 2026
Go RED intake is unresolved: grants directory describes rolling deadlines through November 30, 2026, but detailed program page still says paused with a conditional October 1 reopening. Current guide expressly excludes leases; legacy Clean Fuels is closed.
Both official watch pages and guide reread; official discovery performed. Confirm actual reopening/funds before quoting availability. Prior facts/dates preserved; no full-rule approval. Local/utility discovery targeted, not exhaustive.
ArizonaOct 5, 2026
Maricopa continues to describe State Clean Diesel and historical awards, without a confirmed current on-road Class 8 application round. ADEQ discovery surfaced a Class 5 pilot, but direct application retrieval failed; no Class 8 award added.
Read Clean Diesel, grant overview and ADEQ press watch URLs plus official-domain discovery. No complete current Class 8 vehicle/lease/application rules were obtained. Class 5 search lead is not publication evidence for Class 8. Local/tribal/utility search not exhaustive; no-program conclusion not warranted.
CaliforniaOct 5, 2026
Existing California programs reviewed with HVIP/ISEF purchaser and operating uncertainty retained. SCAG Round2 Class8 offers up to $108,000 and its September22 extension moves deadline to January11 2027; catalog addition held over differing mileage rules and unresolved REL fit. SanDiego form requires lessee/operator as purchaser.
State and selected regional administrator searches covered HVIP/ISEF, CCFR, San Diego, South Coast INVEST CLEAN and SCAG. Not an exhaustive census of air districts/utilities. INVEST CLEAN Measure 2.1 PDF describes a closed 2025 window; no reopening inferred. Full existing-program rules remain incomplete where noted. SCAG June2026 plan says 5,000 total annual miles/75% MSA; July announcement says 5,000 within MSA. No explicit supersession resolved this; administrator clarification required.
ColoradoOct 5, 2026
CDOT official overview identifies Clean Fleet Enterprise support, but current administering and innovative-truck-tax pages could not be read.
All three watch URLs returned 403; CDOT overview readable and fresh discovery searched. No amount, opening, model or lease approval inferred; no Colorado catalog addition cleared.
ConnecticutOct 5, 2026
VW Round 4 remains closed after June 11, 2026. Re-read application rules; DEEP DERA page still says FY2025–2026 funding not available. Official-source discovery did not establish another current Class 8 purchase round.
Statewide official watch pages and independent announcement search covered; local/utility discovery is not a guarantee of exhaustive offerings. No REL approval inferred.
District of ColumbiaOct 5, 2026
DC DRIVE still identifies private Class 4–8 replacement assistance and purchase-only treatment; current intake remains internally ambiguous.
Current program and launch pages plus discovery search reviewed. Limited-funds wording conflicts with future intake form; full agreement, enhancements and retention rules unverified.
DelawareOct 5, 2026
VW Phase 5 heavy-duty replacement solicitation closed April 30, 2026, 4 p.m. local time; complete relevant rules remain unavailable.
All watch pages and official discovery searched. Procurement details show deadline but no readable full solicitation; current DERA/lease/award rules not established. $2.5m allocation is not a truck award.
FloridaOct 5, 2026
No current private Class 8 battery-electric program identified in reviewed DEP watch sources and official discovery. The Class 8 municipal/drayage round closed April 23, 2026 and lists diesel/CNG/propane; electric is listed only in a separate Class 4–7 garbage-truck round.
Checked both DEP watch URLs and current official-source searches. No exhaustive municipal, port or utility audit; past federal port awards are not a new open truck rebate.
GeorgiaOct 5, 2026
No current private Class 8 purchase/lease incentive found in reviewed EPD/OPB sources. State DERA is school-bus focused and October 2024 VW plan allocates its truck categories zero funding.
Both prior watch pages and plan reopened; official announcement discovery completed, including utility/municipal leads. Charging-only programs excluded; not an exhaustive statewide absence claim.
HawaiiOct 5, 2026
DRR notice continues rolling rebates through September 30, 2028, with leases prohibited, but the live application still gives a September 30, 2026 project deadline.
Watch page, guide, application and official discovery reviewed. Completion-date and charging conflicts persist; funds/model-specific award and transaction schedule need administrator confirmation.
IowaOct 5, 2026
Cycle 4 continues advertising October 26, 2026 intake with Class 8 electric replacement support and explicit lease exclusion; exact CST/CDT cutoff remains conflicting.
All historical watch sources read, plus Iowa DERA page and state announcement search. Rules and status attempted; unresolved deadline prevents a settled finding. No guarantee for REL leases.
IdahoOct 5, 2026
DEQ still displays the 2025 Vehicle Replacement Program with an expired September 22, 2025 deadline; no successor intake established in checked sources.
Guide initially failed but final direct reopen recovered the July2025 guide; amount and timing pages read. Complete lease/model/retention applicability remains unresolved. Current page and official discovery reviewed; not a statewide no-program assertion.
IllinoisOct 5, 2026
Illinois EPA Round 9 remains open; ComEd 2026 commercial Class 8 rules remain published but live utility funding is unresolved. No separately verified replacement program was found.
All historical watch URLs attempted; main ComEd page returned no readable content. ChooseEV waitlist remains a lead. State/local announcement searches and rules review performed; not an exhaustive utility inventory.
IndianaOct 5, 2026
DieselWise cataloged 2025 round remains closed and lease-ineligible. Current IDEM DieselWise and VW pages and official announcement searches did not establish a newer private Class 8 offer.
Historic RFP completion date September 30, 2026 has passed. General VW authorization is not an open round. Local and utility discovery is targeted, not exhaustive.
KansasOct 5, 2026
Kansas Clean Vehicles 2026 Class 8 round remains closed after May 11, 2026; existing explicit lease exclusion preserved. DERA watch source is school-bus-only.
All watch URLs and official discovery searched. Initial RFA truck/funding pages readable but later targeted pages failed; full lease/retention follow-up incomplete. E-RAMP is planning, not verified private truck funding. Independent fresh source reopen returned 403; finding remains unresolved, not a no-program assertion.
KentuckyOct 5, 2026
VW watch page assigns funds to buses and light-duty charging; 2026 charging intake is outside the Class 8 vehicle-purchase catalog. No new truck program found in official discovery, but detailed Clean Diesel watch-page reread failed after initial retrieval.
Official discovery and VW page completed. Clean Diesel detailed content could not be recovered in web follow-up; do not refresh a settled statewide no-program finding from that partial access.
LouisianaOct 5, 2026
LDEQ VW page still says applications closed with no planned reopening. DERA page includes heavy/medium trucks and electrification but links only a 2023–24 guide; no current private-fleet application window established.
Both watch pages and official discovery search completed; current DERA terms, lease applicability and deadlines remain unverified. Historical EDMS document does not resolve a 2026 window; no absence claim.
MassachusettsOct 5, 2026
MOR-EV remains cataloged with unresolved Block 2/model-list discrepancy and unlisted Tesla Semi. Re-read administrator page and terms; discovered proposed 2026 regulatory revisions and DERA solicitation leads.
Mass.gov rulemaking and DERA pages inaccessible on direct opens; proposals are not treated as effective changes and additional-program review is incomplete.
MarylandOct 5, 2026
FY2027 MHD ZEV intake is closed after September 29, 2026. Third-party leasing remains expressly contemplated, with both parties eligible and transaction review required.
Current program/FOA and official-announcement search reviewed; no additional relevant fully verified program found. No particular Tesla configuration or REL lease approved.
MaineOct 5, 2026
DEP Clean Diesel still describes private Class 5–8 electric replacements and an example 45% project reimbursement; periodic rolling applications alone do not establish available current Class 8 funds.
Current truck round, terms, lease treatment and balance remain unverified. Maine/administrator announcement discovery and business EV overview checked; no new truck program fully validated.
MichiganOct 5, 2026
EGLE now explicitly labels the 2026 Fuel Transformation RFP closed; older soliciting/until-exhaustion wording remains lower on the same page. The FY2026 RFP truck-replacement language and general vehicle-cost exclusion remain unresolved. No catalog addition approved.
Current official closure header overrides older open solicitation text; closure effective date not stated. Page, RFP, older FAQ and May 19 announcement read. Lease/Tesla fit and conflicting vehicle-cost wording unresolved; broader state/local search performed without a fully verified replacement round.
MinnesotaOct 5, 2026
MPCA still marks food-systems equipment/vehicle grants closed March 27, 2026; 2023 semi-tractor awards remain historical. Current grant directory did not establish a new Class 8 offer.
All stored watch URLs plus current grants directory and official announcement search reviewed. Complete food-systems solicitation, Class 8 and leasing rules remain unrecovered; no approved new program or broad no-program conclusion.
MissouriOct 5, 2026
DERA remains closed with a possible late-2026/early-2027 round; historical rules exclude leasing. Separate VW truck funding is exhausted with no next round planned.
Current status, historical rules and official announcement search reviewed. Future DERA dates and requirements have not been announced. Local/utility discovery targeted.
MississippiOct 5, 2026
Historical VW Class 8 replacement pathway remains, but the second-round forecast still says late 2024/2025. No current round was established. DERA source remains school-bus focused.
Reopened both official watch pages and historical application plus official announcement search. Current funding, lease/model and post-award conditions remain unresolved; do not equate stale page with closure.
MontanaOct 5, 2026
The located Clean Truck/Bus/Airport 2025–26 round remains closed under its January 30, 2026 deadline; private Class 8 electric replacements are described.
All watch sources and official discovery searched. RFA material rules reread, but final eMACS addenda, definitive replacement lease/model approval and complete post-award terms remain unverified. $500,000 is project cap.
North CarolinaOct 5, 2026
Mobile Sources 2024 round remains closed since January 31, 2025; current page covers private/public replacements. VW clean-vehicle page describes historical awards.
Both watch pages and official discovery searched. Linked Mobile Sources RFP still returns document-loading shell; full award/lease/model/retention review unavailable, so no new catalog record.
North DakotaOct 5, 2026
No current private Class 8 electric-truck acquisition offer was found in reviewed NDDEQ sources and official announcement search. Final VW funding closed September 13, 2024; Clean Diesel asks readers to check back.
All three watch URLs directly read. Final VW guidance is school-bus-only and Clean Diesel describes cleaner diesel replacements. Local, utility and tribal opportunities were not exhaustively reviewed.
NebraskaOct 5, 2026
No Class 8 battery-electric acquisition offer was found in reviewed Nebraska Clean Diesel, VW, ONE RED and official announcement sources. Published truck rebates support diesel/low-NOx CNG, not electric trucks.
All three watch pages read. Irrigation electrification and charging are not truck rebates; current state/local announcement searches added no verified relevant program. Utility/local coverage is not exhaustive.
New HampshireOct 5, 2026
NHDES watch pages and 2026 amendment returned 403. Freshly read municipal packet reproduces March RFP limited to public entities; regional planning page includes private/nonprofit applicants and different caps.
Conflict unresolved; no private REL eligibility or per-truck cap published. Current administrator text, amendments and DERA applicability remain gaps despite official announcement searches.
New JerseyOct 5, 2026
NJ ZIP Phase 3 purchaser/vendor closure remains. Official September 30 announcement says Take Charge opens October 5, 2026 for fleet charging with renewables/storage; excluded from truck purchase catalog. NYC regional program covers four NJ counties.
Vehicle list download failed, preserving Tesla approval gap. Take Charge is infrastructure funding, not an additional per-truck rebate. Discovery does not certify every local utility offering.
New MexicoOct 5, 2026
NMED still explicitly accepts 2026 Clean Diesel applications on a rolling basis; October 2025 guidance excludes leased vehicles.
Current watch page, guidance and official discovery searched. Purchase-only record retained; full geography documentation, vendor/model approval and post-award review incomplete.
NevadaOct 5, 2026
DEMF remains closed with historical applicant-lease exclusion. NDEP says Clean Trucks and Buses is still being developed pending federal requirements. A separate Clean Diesel page anticipates funding, but a current Class 8/REL award is not established.
All prior watch URLs read; additional NDEP search and Clean Diesel page reviewed. Full new-round funding/vehicle/lease rules were not established for Clean Diesel or Clean Trucks. Posted statutory amounts or anticipated funds do not establish an available rebate. Local programs not exhaustively surveyed.
New YorkOct 5, 2026
NYTVIP Class 3–8 remains closed; manual clarifies leasing-company purchase with known operator and minimum three-year lease. NYC intake continues and Tesla appears in vendor network.
Official watch/announcement discovery completed for cataloged tracks. Workbook lists a specific MY2024 Tesla configuration, not arbitrary model years; REL transaction still requires review. NYC NY/NJ delivery-trigger difference needs confirmation. No additional fully verified program proposed.
OhioOct 5, 2026
Ohio EPA customer guidance continues describing electric replacements in priority counties, but the main DMTF page/guidelines remained inaccessible; current round and private Class 8 lease eligibility unresolved.
Both watch URLs attempted and official announcement searches performed. Help page read, main page failed again via direct and linked open. Failed access is not evidence of closure or no funding.
OklahomaOct 5, 2026
VW On-Road remains closed; DEQ Clean Diesel current page also says its FY23/FY24 intake is closed. No newly open private Class 8 award identified in this scoped official discovery.
Reopened previous watch sources and new DERA page; official announcement search completed. Lease/model uncertainty in historical truck program remains; not a statewide proof of absence.
OregonOct 5, 2026
ZERO Fleet still offers Class 8 $120,000 and lists Tesla Semi, but third-party lease/rule-version reconciliation remains unresolved. Diesel Mitigation 2026 schedule still estimates October 21 closure; separate Clean Truck funding only hopes to reopen in 2027.
Read both watch pages, manuals, model list and adopted-rule page; state official searches included new funding announcements. Current adopted order was not fully reconciled against the older ZERO Fleet manual. Diesel lease/stacking fit remains unconfirmed. Local/utility coverage not exhaustive.
PennsylvaniaOct 5, 2026
AFIG 2026 and PA-FIT 2025 remain closed purchase programs; REL-owned leases are excluded. AFIG anticipates winter 2027 reopening and contains existing-fleet award reductions.
Current program pages, manuals, deadline announcement and discovery searches reviewed. AFIG current closure controls over original October 7 guideline date. No new opening or transaction approval asserted; PA-FIT full post-award review incomplete.
Rhode IslandOct 5, 2026
DEM still lists October 2, 2026 as the extended 2026 DERA application deadline; that date has passed. The prior lead is no longer timely as an open opportunity. Private Class 5–8 electric replacements are described on the official page.
Current 2026 RFP/application links could not be resolved/read. Hold catalog addition and award/lease/stacking assertions; no reopening was directly confirmed. Source updated September 4, 2026.
South CarolinaOct 5, 2026
FY2024 DERA covers private/public heavy-truck replacement but leased vehicles are excluded; late applications depend on remaining funding.
Current RFP and incorporated guide, materials and official discovery searched. June 12 priority date does not prove closure; live uncommitted funding and definitive intake unavailable.
South DakotaOct 5, 2026
No current private Class 8 electric-truck offer was found in reviewed DANR sources and official announcement search. VW truck recipients are state/local governments; Clean Diesel round addresses buses.
Both stored watch pages read. VW round 11 and Clean Diesel round 18 historical schedules are not private-fleet availability. Local/utility coverage targeted, not exhaustive.
TennesseeOct 5, 2026
TDEC MHD Round 2 remains closed after August 21, 2026. Titled-lessor pathway, five-year Tennessee operation/reporting and conditional external cost share reconfirmed.
Reopened MHD watch page/manual and official announcement searches. The Freight Electrification Framework is planning support, not an open rebate. Tesla/vendor fit and future rounds remain unconfirmed; targeted local/utility discovery.
TexasOct 5, 2026
TxVEMP and SPRY remain open; TERP Rebate remains closed; Clean Fleet forecasts January 2027. New NCTCOG North Texas DERA lead is closed after September 11, 2026; its Class 5–8 zero-emission replacement path merits separate lease/contract review. NTxZEV is Class 6/7 and excluded.
Checked all prior TCEQ watch pages plus official NCTCOG search/results and linked DERA rules. Local/utility discovery is targeted, not exhaustive; no new program has cleared full publication review.
UtahOct 5, 2026
Recovered current Clean Fleet page advertises applications, DERA electric Class5–8 support up to45%, and Clean Ports Class8 drayage at Salt Lake City Intermodal Terminal up to75% without scrappage or90% with it. Complete current transaction rules remain unverified.
Initial403 recovered on final direct reopen. Two bids and approval before purchase apply. The separate upcoming-funding page still describes development; launch/status wording conflicts, and full lease/Tesla/delivery/retention/stacking terms remain unverified. No new catalog record approved.
VirginiaOct 5, 2026
GO-Zero July 10–August 24, 2026 round remains closed. General manufacturer resources include Tesla Semi, but configuration and REL leasing approval remain unconfirmed.
Current program, July application, FAQs/resources, Port dashboard, statutory authority and official discovery searched. Two-year Port service is not a lease minimum; statute alone does not establish open statewide funding.
VermontOct 5, 2026
Existing 2026 VW electric-truck opportunity confirmed through recovered official bid registry, RFA and September 24 addendum. Next monthly deadline October 31, 2026 at 4 p.m. EDT; December 31 final cutoff or exhaustion. September 24 remaining funds are a dated snapshot. No separate new truck award was verified in this discovery.
DEC and Agriculture announcement access remained unsuccessful. Registry and its current addenda were inspected, but other state/local announcements and complete program grant terms were not exhaustively verified; broader discovery and REL lease/model fit remain gaps.
WashingtonOct 5, 2026
WAZIP retains $175,000 base/$200,000 enhanced, but leasing-company purchaser ranking requires base-only correction. Ecology Combined Funding accepts applications through December10 2026; recovered FAQ explicitly excludes applicant lease costs and permits WAZIP pairing under both programs’ rules. Exact Tesla/REL owning-lessor fit remains unresolved.
Official discovery and all watch URLs reviewed. Initially failing Ecology guideline recovered through publication landing page; guide and FAQ successfully read. WAZIP model catalog lacks extractable model approval rows. No exhaustive local/utility census, and REL applicability remains unapproved.
WisconsinOct 5, 2026
DNR currently advertises 2026 National DERA applications due January 22, 2027 at 11:59 p.m. ET for eligible public agencies and qualifying nonprofits; this is a federal opportunity, not a verified private per-truck state award. DOA watch describes state-fleet/public-transit funding. No additional state/local truck award is ready for catalog publication.
All stored watch pages read and official discovery searched. Newly advertised federal NOFO/partner applicability has not received full truck/lease review; local/utility coverage is not exhaustive. Do not interpret this finding as no available grants.
West VirginiaOct 5, 2026
WVDOT settlement and DEP diesel pages were readable but did not establish a current private Class 8 purchase/lease solicitation in the checked sources.
Official search and all watch URLs attempted. Final mitigation-plan PDF failed retrieval, so prior no-current-program finding is not refreshed as a definitive absence; local or future opportunities remain possible.
WyomingOct 5, 2026
VW page still anticipates future opportunities without a dated private-fleet solicitation; posted diesel replacement truck offering is restricted to municipalities/counties.
All watch URLs and fresh discovery searched. Undated later-this-year wording is not a 2026 opening; historical VW funding report does not establish a current private Class 8 lease program.
Oct 15, 2026 · Funding check
42 programs checkedWeekly targeted status and deadline review of all 42 cataloged programs found no supported catalog fact change or reopening. Thirty-two program checks were independently verified unchanged; ten remain needs-review exceptions because current status, availability, or deadline evidence is conflicting or incomplete. Oregon closes October 21, Iowa closes October 26 with an unresolved CST/CDT cutoff conflict, Vermont has an October 31 rolling deadline, and Washington closes December 10. Discovery was limited to relevant official announcements; no statewide discovery dates were refreshed.
California Clean Fuel Reward — Class 8Checked — unchanged
Official program page continues to offer point-of-sale rewards for eligible new battery-electric Class 2b-8 vehicles.
Scope: funding status only
California HVIP — Standard Truck VouchersChecked — unchanged
Standard HVIP remains closed; a possible late-2026 reopening is not yet effective.
Scope: funding status only
California Innovative Small E-Fleet (ISEF)Review needed
ISEF requires an approved provider, but the current official pages do not expressly confirm available ISEF funding. Preserve verify status and provider-fit exception.
Scope: funding status only
San Diego Portside Zero-Emission Truck PilotChecked — unchanged
First-come applications remain open until funds are exhausted.
Scope: funding status only
NJ ZIP — Phase 3Checked — unchanged
Phase 3 purchaser and vendor application intake remains closed.
Scope: funding status only
New York Truck Voucher Incentive ProgramChecked — unchanged
Class 3-8 zero-emission vehicle applications remain closed.
Scope: funding status only
MOR-EV Trucks — Class 8Checked — unchanged
Current official availability tables still show Block 2 and Block 3 incentives remaining. Open status is unchanged; existing Class 8 amount and eligible-model exceptions remain visible.
Scope: program status, summary
NYC Clean Trucks ProgramChecked — unchanged
Rebate funding remains available with no fixed closing date shown.
Scope: funding status only
Washington Zero-Emission Incentive Program (WAZIP)Checked — unchanged
Current Class 7-8 funding remains displayed as available.
Scope: funding status only
Zero-Emissions Rebates for Oregon FleetsChecked — unchanged
Class 8 purchaser access remains open; the current closed notice is limited to Class 3.
Scope: funding status only
Texas Volkswagen Environmental Mitigation Program — All-ElectricChecked — unchanged
First-come applications remain accepted through August 31, 2029 unless suspended earlier.
Scope: funding status only
Driving a Cleaner Illinois — Volkswagen Round 9 Electric TrucksChecked — unchanged
Round 9 applications remain accepted until available funding is depleted.
Scope: funding status only
California HVIP — Drayage Truck Set-AsideChecked — unchanged
The HVIP Drayage category remains open.
Scope: funding status only
Oregon Diesel Emissions Mitigation Grants — Class 8 ReplacementChecked — unchanged
Applications remain open with the near deadline of October 21, 2026; no extension or early closure was found.
Scope: funding status only
Washington Diesel Reduction Combined Funding — Local FreightChecked — unchanged
Applications remain open through December 10, 2026.
Scope: funding status only
Connecticut VW Diesel Emissions Mitigation — Round 4Checked — unchanged
The fixed June 11, 2026 deadline controls over stale introductory intake language, so the round remains closed.
Scope: funding status only
Vermont VW Environmental Mitigation Trust — 2026 Electric TrucksChecked — unchanged
Rolling intake remains open through December 31, 2026. The next monthly deadline is October 31, 2026 at 4:00 p.m. EDT.
Scope: funding status only
Hawaiʻi Diesel Replacement Rebate — Class 8Review needed
The official page continues to advertise rolling applications through September 30, 2028, but current application materials retain a September 30, 2026 completion-timing conflict. Preserve open status and the visible timing exception.
Scope: funding status only
Idaho Vehicle Replacement Program — Class 8Checked — unchanged
The September 22, 2025 deadline has passed and no new round is announced.
Scope: funding status only
Montana Clean Truck, Bus & Airport Equipment — TrucksChecked — unchanged
The January 30, 2026 final deadline has passed; no new intake is active.
Scope: funding status only
Kansas Clean Vehicles — Class 8 Truck ReplacementChecked — unchanged
The May 11, 2026 deadline has passed.
Scope: funding status only
ComEd — Business and Public Sector Class 8 EV Rebates (2026)Review needed
Terms cover calendar 2026 or exhaustion, but current vehicle-rebate funding or waitlist status could not be confirmed. Preserve verify status and exception.
Scope: funding status only
DieselWise Indiana — 2025 Diesel Replacement GrantsReview needed
No new round is announced, but the official page lists older solicitation material without a clear current closure statement. Retain closed status pending clearer confirmation.
Scope: funding status only
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementReview needed
Open through October 26, 2026. The exact 5 p.m. cutoff remains unresolved because the webpage says CST while the guidance says CDT; do not claim a resolved timezone.
Scope: funding status only
Missouri VW Trust — DERA Truck Replacement OptionChecked — unchanged
The application period remains closed; a late-2026 or early-2027 reopening is only anticipated.
Scope: funding status only
Texas TERP Rebate Grants — New Zero-Emission TrucksChecked — unchanged
TCEQ continues to mark the rebate program closed.
Scope: funding status only
Texas Seaport and Rail Yard Areas Emissions Reduction (SPRY)Checked — unchanged
First-come applications remain open through March 12, 2027 while funds remain.
Scope: funding status only
Texas Clean Fleet Program (TCFP)Checked — unchanged
The program remains upcoming with a projected January 2027 opening subject to change.
Scope: funding status only
Oklahoma Volkswagen On-Road ProgramChecked — unchanged
Oklahoma is not accepting new projects; the program remains closed.
Scope: funding status only
Arkansas Go RED! — Electric Truck ReplacementReview needed
Preserve closed status, but official Arkansas notices remain contradictory: the detailed Go RED page says intake is closed while the grants directory describes monthly deadlines through November 30, 2026 or exhaustion. No reopening is published.
Scope: program status, summary
Alabama Volkswagen Settlement — 2026 Truck ReplacementsChecked — unchanged
Round 3 remains closed because the fixed October 6, 2026 at 11:59 p.m. Central deadline has passed, despite stale accepting language on the page.
Scope: program status, summary
Mississippi Volkswagen Environmental Mitigation — TrucksReview needed
The official page documents the closed 2021 round and an outdated expectation of a later round, but no current window. Preserve verify status.
Scope: funding status only
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027Checked — unchanged
The September 29 deadline has passed and the portal remains closed.
Scope: funding status only
Pennsylvania Alternative Fuels Incentive Grant — 2026Checked — unchanged
AFIG 2026 remains closed; winter 2027 reopening is only anticipated.
Scope: funding status only
Port of Virginia GO-Zero — 2026Checked — unchanged
The July 10-August 24, 2026 window has ended.
Scope: funding status only
Tennessee VW Medium/Heavy-Duty Vehicles — Round 2Checked — unchanged
The August 21, 2026 deadline has passed.
Scope: funding status only
Pennsylvania Freight Innovations in Transportation — 2025Checked — unchanged
The extended December 19, 2025 deadline has passed; no reopening was found.
Scope: funding status only
South Carolina DERA State Grants — FY2024 solicitationReview needed
Only older application materials are displayed; no current opening, closure, or remaining-funds statement is definitive. Preserve verify status.
Scope: funding status only
New Mexico Clean Diesel Program — Electric Truck ReplacementChecked — unchanged
Rolling applications remain open while 2026 funds last.
Scope: funding status only
DC DRIVE — Diesel Reduction Incentives for Vehicle ElectrificationReview needed
The official page references limited funding but also says the intake form will become available when applications open. Preserve verify status.
Scope: funding status only
Ports of Los Angeles and Long Beach — HVIP Drayage Plus UpReview needed
The April opening announcement remains official, but current plus-up balance and availability are not confirmed. Preserve verify status.
Scope: funding status only
Nevada Diesel Emission Mitigation Fund — Truck ReplacementChecked — unchanged
Nevada is not accepting applications; the program remains closed.
Scope: funding status only
Discovery: Weekly targeted review checked every cataloged program, including closed and lease-restricted records, against current official administering-agency pages and relevant linked materials. Discovery was limited to relevant announcements and did not refresh any statewide discovery date. No broad local, utility, port or statewide inventory search is claimed. Existing source conflicts and applicability exceptions were preserved where current evidence did not resolve them.
Oct 8, 2026 · Funding check
42 programs checkedWeekly status review of all 42 cataloged programs found three supported changes: Alabama Round 3 and Arkansas Go RED are closed, and MOR-EV Class 8 has active funding while its amount and model-fit exceptions remain unresolved. Thirty-two other statuses were independently verified unchanged and seven remain needs-review exceptions. Discovery was limited to relevant official announcements; no statewide discovery dates were refreshed.
California Clean Fuel Reward — Class 8Checked — unchanged
Official program page continues to offer point-of-sale rewards for eligible new battery-electric Class 2b-8 vehicles.
Scope: funding status only
California HVIP — Standard Truck VouchersChecked — unchanged
Standard HVIP remains closed; a possible late-2026 reopening is not yet effective.
Scope: funding status only
California Innovative Small E-Fleet (ISEF)Review needed
ISEF requires an approved provider, but the current official pages do not expressly confirm available ISEF funding. Preserve verify status and provider-fit exception.
Scope: funding status only
San Diego Portside Zero-Emission Truck PilotChecked — unchanged
First-come applications remain open until funds are exhausted.
Scope: funding status only
NJ ZIP — Phase 3Checked — unchanged
Phase 3 purchaser and vendor application intake remains closed.
Scope: funding status only
New York Truck Voucher Incentive ProgramChecked — unchanged
Class 3-8 zero-emission vehicle applications remain closed.
Scope: funding status only
MOR-EV Trucks — Class 8Verified change
Current official availability tables show remaining Block 2 and Block 3 incentives, so status changes from verify to open. Existing amount and eligible-model exceptions remain unresolved and visible.
Scope: program status, summary · Effective Oct 8, 2026
| Field | Previous | Published |
|---|---|---|
| program status | "verify" | "open" |
| summary | "Program is accepting reservations, but Tesla Semi is absent from its current eligible-truck list. Confirm model approval before treating this as a Tesla lease incentive." | "Program is open with incentives remaining, but Tesla Semi is absent from its current eligible-truck list. Confirm model approval before treating this as a Tesla lease incentive." |
NYC Clean Trucks ProgramChecked — unchanged
Rebate funding remains available with no fixed closing date shown.
Scope: funding status only
Washington Zero-Emission Incentive Program (WAZIP)Checked — unchanged
Current Class 7-8 funding remains displayed as available.
Scope: funding status only
Zero-Emissions Rebates for Oregon FleetsChecked — unchanged
Class 8 purchaser access remains open; the current closed notice is limited to Class 3.
Scope: funding status only
Texas Volkswagen Environmental Mitigation Program — All-ElectricChecked — unchanged
First-come applications remain accepted through August 31, 2029 unless suspended earlier.
Scope: funding status only
Driving a Cleaner Illinois — Volkswagen Round 9 Electric TrucksChecked — unchanged
Round 9 applications remain accepted until available funding is depleted.
Scope: funding status only
California HVIP — Drayage Truck Set-AsideChecked — unchanged
The HVIP Drayage category remains open.
Scope: funding status only
Oregon Diesel Emissions Mitigation Grants — Class 8 ReplacementChecked — unchanged
Applications remain open with a near deadline of October 21, 2026.
Scope: funding status only
Washington Diesel Reduction Combined Funding — Local FreightChecked — unchanged
Applications remain open through December 10, 2026.
Scope: funding status only
Connecticut VW Diesel Emissions Mitigation — Round 4Checked — unchanged
The fixed June 11, 2026 deadline controls over stale introductory intake language, so the round remains closed.
Scope: funding status only
Vermont VW Environmental Mitigation Trust — 2026 Electric TrucksChecked — unchanged
Solicitation remains open through December 31, with the next rolling deadline October 31 at 4 p.m. EDT.
Scope: funding status only
Hawaiʻi Diesel Replacement Rebate — Class 8Checked — unchanged
Rolling applications remain open through September 30, 2028 or until funds are exhausted.
Scope: funding status only
Idaho Vehicle Replacement Program — Class 8Checked — unchanged
The September 22, 2025 deadline has passed and no new round is announced.
Scope: funding status only
Montana Clean Truck, Bus & Airport Equipment — TrucksChecked — unchanged
The January 30, 2026 final deadline has passed; no new intake is active.
Scope: funding status only
Kansas Clean Vehicles — Class 8 Truck ReplacementChecked — unchanged
The May 11, 2026 deadline has passed.
Scope: funding status only
ComEd — Business and Public Sector Class 8 EV Rebates (2026)Review needed
Terms cover calendar 2026 or exhaustion, but current vehicle-rebate funding or waitlist status could not be confirmed. Preserve verify status and exception.
Scope: funding status only
DieselWise Indiana — 2025 Diesel Replacement GrantsReview needed
No new round is announced, but the official page lists older solicitation material without a clear current closure statement. Retain closed status pending clearer confirmation.
Scope: funding status only
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementChecked — unchanged
Applications remain open with a near deadline of October 26, 2026 at 5 p.m. CST.
Scope: funding status only
Missouri VW Trust — DERA Truck Replacement OptionChecked — unchanged
The application period remains closed; a late-2026 or early-2027 reopening is only anticipated.
Scope: funding status only
Texas TERP Rebate Grants — New Zero-Emission TrucksChecked — unchanged
TCEQ continues to mark the rebate program closed.
Scope: funding status only
Texas Seaport and Rail Yard Areas Emissions Reduction (SPRY)Checked — unchanged
First-come applications remain open through March 12, 2027 while funds remain.
Scope: funding status only
Texas Clean Fleet Program (TCFP)Checked — unchanged
The program remains upcoming with a projected January 2027 opening subject to change.
Scope: funding status only
Oklahoma Volkswagen On-Road ProgramChecked — unchanged
Oklahoma is not accepting new projects; the program remains closed.
Scope: funding status only
Arkansas Go RED! — Electric Truck ReplacementVerified change
Arkansas DEQ now expressly says the application period has closed. Apply the closure at publication; the explicit leased-vehicle exclusion remains unchanged.
Scope: program status, summary · Effective Oct 8, 2026
| Field | Previous | Published |
|---|---|---|
| program status | "open" | "closed" |
| summary | "Open competitive replacement funding with monthly deadlines through November 30, 2026 or exhaustion. The 2026 guide explicitly prohibits leasing." | "The 2026 Go RED! application period is closed. Future funding notices may be announced; the program explicitly prohibits leased project vehicles." |
Alabama Volkswagen Settlement — 2026 Truck ReplacementsVerified change
The explicit October 6, 2026 at 11:59 p.m. Central deadline has passed. Apply closure at publication rather than backdating; preserve the unresolved REL lease exception.
Scope: program status, summary · Effective Oct 8, 2026
| Field | Previous | Published |
|---|---|---|
| program status | "open" | "closed" |
| summary | "Open through October 6, 2026 for eligible Class 8 local-freight and drayage replacements. Private electric projects require at least 25% cost share; REL lease eligibility needs review." | "Round 3 applications closed October 6, 2026 at 11:59 p.m. Central. Award decisions are pending; REL lease eligibility remains unresolved." |
Mississippi Volkswagen Environmental Mitigation — TrucksReview needed
The official page documents the closed 2021 round and an outdated expectation of a later round, but no current window. Preserve verify status.
Scope: funding status only
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027Checked — unchanged
The September 29 deadline has passed and the portal remains closed.
Scope: funding status only
Pennsylvania Alternative Fuels Incentive Grant — 2026Checked — unchanged
AFIG 2026 remains closed; winter 2027 reopening is only anticipated.
Scope: funding status only
Port of Virginia GO-Zero — 2026Checked — unchanged
The July 10-August 24, 2026 window has ended.
Scope: funding status only
Tennessee VW Medium/Heavy-Duty Vehicles — Round 2Checked — unchanged
The August 21, 2026 deadline has passed.
Scope: funding status only
Pennsylvania Freight Innovations in Transportation — 2025Checked — unchanged
The extended December 19, 2025 deadline has passed; no reopening was found.
Scope: funding status only
South Carolina DERA State Grants — FY2024 solicitationReview needed
Only older application materials are displayed; no current opening, closure, or remaining-funds statement is definitive. Preserve verify status.
Scope: funding status only
New Mexico Clean Diesel Program — Electric Truck ReplacementChecked — unchanged
Rolling applications remain open while 2026 funds last.
Scope: funding status only
DC DRIVE — Diesel Reduction Incentives for Vehicle ElectrificationReview needed
The official page references limited funding but also says the intake form will become available when applications open. Preserve verify status.
Scope: funding status only
Ports of Los Angeles and Long Beach — HVIP Drayage Plus UpReview needed
The April opening announcement remains official, but current plus-up balance and availability are not confirmed. Preserve verify status.
Scope: funding status only
Nevada Diesel Emission Mitigation Fund — Truck ReplacementChecked — unchanged
Nevada is not accepting applications; the program remains closed.
Scope: funding status only
Discovery: Weekly targeted review checked every cataloged program, including closed and lease-restricted records, against current official administering-agency pages and relevant linked materials. Discovery was limited to relevant announcements and did not refresh any statewide discovery date. No broad local, utility, port or statewide inventory search is claimed. Existing source conflicts and applicability exceptions were preserved where current evidence did not resolve them.
Oct 5, 2026 · Comprehensive review
42 programs checkedMonthly review: all 42 existing programs researched and all 51 jurisdictions searched; 10 factual corrections, 0 additions, 14 unchanged checks and 18 unresolved checks, including source-access gaps. Only 6 records passed full material-rule verification; other successes are targeted and preserve full-rule dates. All 51 jurisdiction findings received separate source review; 30 retain disclosed research gaps. This is not a completed full-rule verification of the entire catalog. NYC award/stacking conflicts remain unresolved despite the targeted vendor clarification. No new lease eligibility or individual award guarantee is inferred.
California Clean Fuel Reward — Class 8Checked — unchanged
Targeted material-rule review: award, customer/retailer roles, three-year commitments, 180-day delivery, utilization and co-funding unchanged. Eligible-model page did not expose Tesla rows, so exact Tesla configuration/vendor approval remains unverified. No full-rule date refreshed; no remaining-balance guarantee.
Scope: program status, base incentive, maximum incentive, award amount, lease, minimum lease term, REL lease suitability, combining incentives, qualification requirements, locations, operating area, official sources
California HVIP — Standard Truck VouchersReview needed
Monthly material review cannot pass: manual purchaser restrictions in J/K conflict with leasing eligibility in L, and section M requires 100% California operation while K permits Class 8 50% interstate mileage. Preserve existing facts and dates pending CARB reconciliation; do not infer REL eligibility. Funding remains closed for Standard; reopening only targeted by year-end 2026. Tesla Long Range catalog and dealer listing read; exact model-year/transaction approval still required.
Scope: program status, lease, qualification requirements, REL lease suitability, combining incentives, base incentive, maximum incentive, award amount, Tesla model eligibility, minimum lease term, locations, operating area, official sources
California HVIP — Drayage Truck Set-AsideReview needed
Monthly material review cannot pass: manual purchaser restrictions in J/K conflict with leasing eligibility in L, and section M requires 100% California operation while K permits Class 8 50% interstate mileage. Preserve existing facts and dates pending CARB reconciliation; do not infer REL eligibility. Funding remains open for the separate drayage category. Tesla Long Range catalog and dealer listing read; exact model-year/transaction approval still required.
Scope: program status, lease, qualification requirements, REL lease suitability, combining incentives, base incentive, maximum incentive, award amount, Tesla model eligibility, minimum lease term, locations, operating area, official sources
California Innovative Small E-Fleet (ISEF)Review needed
ISEF overview, September 2025 appendix, provider directory, funding and HVIP catalog reread. Current ISEF reservation availability and REL approved-provider/service offering remain unresolved. Ordinary three-plus-year finance leases generally route to Standard HVIP; no REL enhanced award inferred. Prior facts and dates retained. Full verification incomplete.
Scope: program status, lease, REL lease suitability, qualification requirements, Tesla model eligibility, maximum incentive, combining incentives, minimum lease term, locations, operating area, official sources
Ports of Los Angeles and Long Beach — HVIP Drayage Plus UpReview needed
April reopening notice and HVIP rules reread. No current reservation availability established; maintain verify status. Leasing-company purchaser exclusion and broader HVIP purchaser/operating contradictions remain. No full verification refresh.
Scope: program status, lease, REL lease suitability, qualification requirements, base incentive, maximum incentive, combining incentives, Tesla model eligibility
San Diego Portside Zero-Emission Truck PilotVerified change
Direct application adds material applicant-role detail: named lessee/operator must be purchaser and cannot change after submission; existing-vehicle ownership is certified. This clarifies the REL workflow, not a newly enacted rule. Longer lease treatment and exact Tesla approval remain for district review. Targeted update only.
Scope: program status, lease, qualification requirements, summary, official sources · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| lease | "Eligible leases can receive up to 90% of three years of payments. District must confirm treatment of REL's longer term and reimbursement schedule." | "The application requires the lessee/end-user operator to be listed as purchaser and prohibits changing that operator after submission. Up to 90% of three years of lease payments may qualify; district approval of REL’s 4–7-year structure remains necessary." |
| qualification requirements | ["Applicant operated a diesel truck over 14,000 lb GVWR in the Portside community for at least 52 trips per year during the preceding two years.","Operate the replacement there for three years, at least 52 trips and 104 miles annually.","Charging plan, air-quality compliance, insurance, annual reports and three outreach activities required.","District must execute the contract before ordering or leasing the truck.","Old truck scrappage is not required; the district must approve the new vehicle and lease."] | ["Applicant operated a diesel truck over 14,000 lb GVWR in the Portside community for at least 52 trips per year during the preceding two years.","Operate the replacement there for three years, at least 52 trips and 104 miles annually.","Charging plan, air-quality compliance, insurance, annual reports and three outreach activities required.","District must execute the contract before ordering or leasing the truck.","Old truck scrappage is not required; the district must approve the new vehicle and lease.","For a lease, name the lessee/end-user operator as purchaser; that operator cannot change after application. The applicant certifies ownership of the existing truck."] |
| summary | "Local short-haul program tied to truck activity in the defined Portside community. A San Diego County address by itself does not qualify." | "Portside pilot remains open. For a leased truck, the application must identify the lessee/operator as purchaser; REL cannot substitute its reusable company profile for that operator." |
| official sources | [{"label":"Official program, status, eligibility and application","url":"https://www.sdapcd.org/content/sdapcd/grants/grants-equipment/heavy-duty-trucks/zero-emission-truck-pilot-project.html"}] | [{"label":"Official program, status, eligibility and application","url":"https://www.sdapcd.org/content/sdapcd/grants/grants-equipment/heavy-duty-trucks/zero-emission-truck-pilot-project.html"},{"label":"Application: lessee purchaser and existing-vehicle certification","url":"https://www.sdapcd.org/content/dam/sdapcd/documents/grants/ZE%20Truck%20Pilot_application%20form.pdf"}] |
Washington Zero-Emission Incentive Program (WAZIP)Verified change
Display/ranking correction applies established WAZIP base-only rule to REL as leasing-company purchaser: ranking $200,000 to $175,000; general amountMax stays $200,000 for qualifying enhanced purchasers. Targeted award/lease/retention/stacking review only. Tesla model/vendor approval remains unverified; full-rule date not refreshed.
Scope: program status, base incentive, maximum incentive, award amount, lease, minimum lease term, REL lease suitability, combining incentives, locations, operating area, official sources, comparison amount, displayed incentive, summary · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| comparison amount | 200000 | 175000 |
| displayed incentive | "Up to $200,000" | "$175,000 base for leasing purchaser" |
| award amount | "$175,000 base; $200,000 enhanced" | "$175,000 base for leasing-company purchasers; $200,000 enhanced only for qualifying purchaser" |
| summary | "Point-of-sale Class 8 vouchers; current program site states funding is available. Tesla model and dealer approval still require confirmation." | "Class 8 funding is available. Leasing-company purchasers are limited to the $175,000 base; $200,000 enhanced support requires a qualifying purchaser designation. Tesla model and dealer approval remain unconfirmed." |
Zero-Emissions Rebates for Oregon FleetsReview needed
Current page, model list, December 2025 manual and May 18 2026 rulemaking reread. Class 8 remains offered at $120,000 and Tesla Semi listed, but old manual excludes third-party leases and predates adopted changes. Current underlying adopted order/lease reconciliation incomplete. Existing REL caution and verification dates retained; no full verification.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, minimum lease term, REL lease suitability, combining incentives, Tesla model eligibility, locations, operating area, official sources
Oregon Diesel Emissions Mitigation Grants — Class 8 ReplacementReview needed
Current round and September 2026 guide reviewed: deadline estimate remains October 21. Cost basis, scrappage, operation and reporting reread. Guide provides purchase/financing reimbursement but does not settle REL lease owner/operator treatment, minimum term, exact Tesla configuration or ZERO Fleet combination; preserve prior facts/dates. Not a complete applicability verification.
Scope: program status, award amount, qualification requirements, lease, REL lease suitability, combining incentives, Tesla model eligibility, minimum lease term, locations, operating area, official sources
Washington Diesel Reduction Combined Funding — Local FreightVerified change
Official guideline access recovered via its publication page; no source failure remains. FAQ (lease answer marked updated September22) expressly excludes applicant lease costs and confirms recipient ownership; it does not establish REL-owning-lessor fit. FAQ also expressly permits WAZIP pairing subject all program terms. Targeted correction; exact Tesla/REL approval still unresolved, no full-rule date refresh.
Scope: program status, lease, REL lease suitability, displayed incentive, combining incentives, summary, qualification requirements, official sources · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| lease | "Owner application and five-year Washington operation are required, but leasing is unconfirmed. REL's 4–7-year terms, particularly four-year commitments, need Ecology review." | "Leasing a replacement vehicle is not an eligible grant cost; the recipient must own it. REL as an owning lessor is not approved by this FAQ and requires Ecology review. Five-year Washington operation is mandatory." |
| REL lease suitability | "review" | "restricted" |
| displayed incentive | "Up to 75% of cost" | "Lease costs excluded; owner review" |
| combining incentives | "Disclose other support; total reimbursement cannot exceed project cost. Follow other funders' terms. WAZIP pairing is unconfirmed." | "Ecology expressly permits combining with incentives such as WAZIP, subject to every program’s terms and total support no greater than project cost. WAZIP’s own 90% vehicle-cost cap still applies." |
| summary | "Class 4–8 local-freight replacement applications are open September 8–December 10, 2026. Two tracks cover different diesel engine years." | "Applications remain open through December 10, 2026. Applicant lease costs are excluded; recipients must own the truck. Ecology permits WAZIP co-funding subject to both programs’ rules." |
| qualification requirements | ["Washington-licensed organization owning the existing eligible diesel truck.","Class 4–8 local-freight diesel: 1992–2009 engine for AQVWPW-2027 or 2010–2017 for AQDR-2027.","Existing truck licensed and operational in Washington for two years before October 2026; replace with same class/use case unless Ecology approves.","No order or scrappage before signed agreement. Scrap replaced truck; five years of Washington operation for replacement.","Separate application per vehicle. Local freight means city, metro or nearby-county goods transport."] | ["Washington-licensed organization owning the existing eligible diesel truck.","Class 4–8 local-freight diesel: 1992–2009 engine for AQVWPW-2027 or 2010–2017 for AQDR-2027.","Existing truck licensed and operational in Washington for two years before October 2026; replace with same class/use case unless Ecology approves.","No order or scrappage before signed agreement. Scrap replaced truck; five years of Washington operation for replacement.","Separate application per vehicle. Local freight means city, metro or nearby-county goods transport.","Replacement lease costs are not eligible; the recipient must own the funded vehicle. Quarterly progress/payment reporting applies."] |
| official sources | [{"label":"Open round and newer-engine track","url":"https://ecology.wa.gov/about-us/payments-contracts-grants/grants-loans/find-a-grant-or-loan/diesel-reduction-grants"},{"label":"VW older-engine track","url":"https://ecology.wa.gov/about-us/payments-contracts-grants/grants-loans/find-a-grant-or-loan/volkswagen-enforcement-action-grants"},{"label":"2027 combined program guidelines","url":"https://apps.ecology.wa.gov/publications/documents/2602017.pdf"}] | [{"label":"Open round and newer-engine track","url":"https://ecology.wa.gov/about-us/payments-contracts-grants/grants-loans/find-a-grant-or-loan/diesel-reduction-grants"},{"label":"VW older-engine track","url":"https://ecology.wa.gov/about-us/payments-contracts-grants/grants-loans/find-a-grant-or-loan/volkswagen-enforcement-action-grants"},{"label":"2027 combined program guidelines","url":"https://apps.ecology.wa.gov/publications/documents/2602017.pdf"},{"label":"Current FAQ: lease exclusion, vendors and WAZIP pairing","url":"https://apps.ecology.wa.gov/publications/documents/2602021.pdf"}] |
Nevada Diesel Emission Mitigation Fund — Truck ReplacementChecked — unchanged
Targeted current closure and historical lease restriction reverified; no current award reopened. Full historical model/retention/stacking applicability not asserted. Future Clean Trucks program remains in development.
Scope: program status, lease, REL lease suitability
Connecticut VW Diesel Emissions Mitigation — Round 4Checked — unchanged
Reopened DEEP page and directly downloaded/extracted the current June 3 DOCX; all catalog material fields re-read. June 11, 2026 deadline remains past. Existing 60% private project cap, 3-year lease duration and transaction-specific review cautions remain unchanged; no Tesla or REL-specific approval inferred.
Scope: full program review
Vermont VW Environmental Mitigation Trust — 2026 Electric TrucksVerified change
Initial access failures recovered through official registry attachment links. Targeted update publishes the September 24 dated funding snapshot and upcoming monthly deadline, preserving existing amounts and lease caution. Registry and RFA status reviewed; complete grant attachments/lease and transaction fit were not fully revalidated, so no full-rule date refresh.
Scope: program status, summary, official sources, notes · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| summary | "Monthly competitive applications through December 31, 2026, or funding exhaustion, support electric replacements of eligible local freight trucks. Remaining funds must be checked before applying." | "Monthly competitive applications continue through December 31, 2026, or exhaustion. The next deadline is October 31 at 4 p.m. EDT. The September 24 addendum reports $3,329,677 remaining after August awards; this is a dated snapshot, not today’s balance." |
| official sources | [{"label":"Official 2026 solicitation","url":"https://www.vermontbusinessregistry.com/BidPreview.aspx?BidID=73893"},{"label":"2026 RFA and grant terms","url":"https://www.vermontbusinessregistry.com/bidAttachments/73893/RFA_2026_Volkswagen_EMT_EMA.pdf"},{"label":"August 24 applicant Q&A and funding update","url":"https://www.vermontbusinessregistry.com/bidAttachments/73893/Questions_and_Answers_and_Funding_Update_8-24-26.pdf"}] | [{"label":"Official 2026 solicitation","url":"https://www.vermontbusinessregistry.com/BidPreview.aspx?BidID=73893"},{"label":"2026 RFA and grant terms","url":"https://www.vermontbusinessregistry.com/bidAttachments/73893/RFA_2026_Volkswagen_EMT_EMA.pdf"},{"label":"August 24 applicant Q&A and funding update","url":"https://www.vermontbusinessregistry.com/bidAttachments/73893/Questions_and_Answers_and_Funding_Update_8-24-26.pdf"},{"label":"September 24 Q&A and funding update","url":"https://www.vermontbusinessregistry.com/bidAttachments/73893/Questions_and_Answers_and_Funding_Update_9-24-26.pdf"}] |
| notes | "Project-specific percentage award; no per-truck dollar cap asserted. Official RFA and August Q&A were downloaded directly from the state bid registry after the DEC page returned 403. The August remaining-funds figure is not represented as today's balance. No Tesla or REL transaction approval established." | "Project-specific percentage award; no per-truck dollar cap asserted. Official RFA and August Q&A were downloaded directly from the state bid registry after the DEC page returned 403. The August remaining-funds figure is not represented as today's balance. No Tesla or REL transaction approval established. September 24 addendum clarifies that eligibility follows the replaced vehicle’s Vermont registration/use; the replacement also needs Vermont registration and at least 80% Vermont operation. Completion remains June 30, 2028, with extensions considered individually. Comprehensive October review remains incomplete: current REL lease/model fit and full grant terms require further review; no new individual eligibility assurance." |
MOR-EV Trucks — Class 8Review needed
MOR-EV amount/model exception remains: September 2 block table says $76,500 Class 8 Block 2 but model list says $90,000 and excludes Semi. Read current page and linked terms: 48-month lease, registration, retention, application/redemption, reporting and stacking. July 2026 proposed rule changes were discovered but Mass.gov source could not be directly reopened; do not treat proposals as effective law. Full-rule verification withheld.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
NJ ZIP — Phase 3Review needed
Current page and full Phase 3 FAQ re-read: explicit closure governs; amounts, bonuses, purchaser-lessor treatment, retention, delivery and stacking agree with existing record. Current vehicle-list page links June 2026 download but download failed; exact Tesla model/vendor approval not verified. Retain all facts/dates and visible model-review gap rather than claim a full-rule success.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
New York Truck Voucher Incentive ProgramVerified change
Targeted clarification of June 2025 section 6.4: minimum lease unknown → 3 years, known operator/addendum, full voucher reduction, execution within 30 days. Current model workbook recovered and directly read: listed MY2024 Semi Long Range configuration replaces blanket model-unverified text. No MY2026 approval inferred; program remains closed. Full-rule verification not claimed because exact REL transaction and complete ancillary requirements remain unconfirmed.
Scope: program status, minimum lease term, lease, lease minimum years, lease note, qualification requirements, official sources, Tesla model eligibility, tesla status, notes · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| minimum lease term | null | 3 |
| lease | "Leases recognized; specific REL arrangement and retention responsibilities require confirmation." | "Section 6.4 permits a leasing-company purchaser with a known operator and at least a three-year lease from voucher approval. Include the signed operator addendum, disclose and pass through the full voucher reduction, and fully execute within 30 days of approval. REL 4–7-year duration fits; transaction and model approval remain required." |
| lease minimum years | null | 3 |
| lease note | "Leases recognized; specific REL arrangement and retention responsibilities require confirmation." | "At least three years from voucher approval; known lessee, operator addendum, full voucher pass-through and execution within 30 days. REL transaction requires review." |
| qualification requirements | ["Published Class 8 BEV bonuses: $60,000 disadvantaged-community, $40,000 small-fleet, $40,000 optional scrappage; $340,000 per-vehicle cap.","Eligible commercial, nonprofit or public fleet with New York domicile/registration/operation; federal entities excluded.","Approved model and dealer required. Tesla Semi configuration and dealer approval remain unverified.","Purchases and leases can participate, but REL's ownership, lease and benefit-pass-through structure needs program confirmation.","Class 3–8 trucks require three years of ownership/operation commitments and usage reporting; at least 5,000 miles annually.","Official fleet page requires at least 80% of operation time in New York.","Dealer applies for the fleet after a purchase order; award starts an 18-month delivery/redemption period.","Scrappage is optional unless claiming its bonus; applicable bonus vehicles must satisfy program standards.","Stacking is limited: other NYSERDA grants, FTA Lo-No and EPA DERA funds cannot be combined. Total assistance cannot exceed vehicle base cost."] | ["Published Class 8 BEV bonuses: $60,000 disadvantaged-community, $40,000 small-fleet, $40,000 optional scrappage; $340,000 per-vehicle cap.","Eligible commercial, nonprofit or public fleet with New York domicile/registration/operation; federal entities excluded.","Approved model and dealer required. Published workbook lists new MY2024 Tesla Semi Long Range, Class 8, 49,500-lb / 294-inch configuration; confirm exact ordered model year/configuration and dealer before application.","Leasing-company purchasers with a known lessee may participate under section 6.4. Lease must cover at least three years from voucher approval, name the operator, include its addendum and pass through the full voucher capital-cost reduction; fully execute within 30 days of approval. REL 4–7-year terms meet duration screening only.","Class 3–8 trucks require three years of ownership/operation commitments and usage reporting; at least 5,000 miles annually.","Official fleet page requires at least 80% of operation time in New York.","Dealer applies for the fleet after a purchase order; award starts an 18-month delivery/redemption period.","Scrappage is optional unless claiming its bonus; applicable bonus vehicles must satisfy program standards.","Stacking is limited: other NYSERDA grants, FTA Lo-No and EPA DERA funds cannot be combined. Total assistance cannot exceed vehicle base cost."] |
| official sources | [{"label":"Official program","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program"},{"label":"Eligibility and program rules","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program/How-the-Program-Works/Funding-Amounts"},{"label":"Eligibility and program rules","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program/For-Vehicle-Fleets"}] | [{"label":"Official program","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program"},{"label":"Eligibility and program rules","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program/How-the-Program-Works/Funding-Amounts"},{"label":"Eligibility and program rules","url":"https://www.nyserda.ny.gov/All-Programs/Truck-Voucher-Program/For-Vehicle-Fleets"},{"label":"Implementation manual, June 2025","url":"https://portal.nyserda.ny.gov/servlet/servlet.FileDownload?file=00Pcr00000MyL0BEAV"},{"label":"Eligible vehicles workbook (current linked download)","url":"https://portal.nyserda.ny.gov/servlet/servlet.FileDownload?file=00Pcr00000z8aw6EAA"}] |
| Tesla model eligibility | "Tesla configuration, seller and REL transaction require confirmation." | "Published eligibility workbook lists the new model-year 2024 Tesla Semi Long Range, Class 8, 49,500-lb / 294-inch configuration. Other model years/configurations and REL transaction approval remain unverified. Funding is closed." |
| tesla status | "verify" | "listed-specific-configuration" |
| notes | "Main program closure notice overrides stale 'currently available' wording on funding page. Published page still mentions 45W; that is not evidence current federal credit eligibility. Amount is BEV, not the larger hydrogen-FCEV cap." | "Main program closure notice overrides stale 'currently available' wording on funding page. Published page still mentions 45W; that is not evidence current federal credit eligibility. Amount is BEV, not the larger hydrogen-FCEV cap. Current downloaded eligible-vehicle workbook lists only the stated MY2024 Tesla Semi Long Range configuration; this is not a current funding offer or approval of MY2026 vehicles. Section 6.4 ordinary lease rules apply; do not infer short-term CaaS eligibility." |
NYC Clean Trucks ProgramVerified change
Targeted Tesla vendor listing clarification only. Independent review identified funding-calculation and stacking discrepancies between webpage/FAQ and April forms, plus NY/NJ delivery-trigger difference. These are disclosed in notes; existing award, eligibility and lease facts/dates preserved. No full-rule verification or exact model approval claimed.
Scope: program status, Tesla model eligibility, summary, official sources, notes · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| Tesla model eligibility | "Tesla configuration, seller and REL transaction require confirmation." | "Tesla, Inc. is listed in the participating vendor network. Exact Semi configuration and REL transaction still require program confirmation." |
| summary | "A regional program for eligible New York metro and nearby New Jersey fleets. Accepting applications first come, first served; Tesla model, vendor and funding require confirmation." | "A regional program for eligible New York metro and nearby New Jersey fleets. Accepting applications first come, first served; Tesla is listed as a participating vendor, while exact model/configuration, transaction and remaining funding require confirmation." |
| official sources | [{"label":"Official program","url":"https://www.nycctp.com/available-funding/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/faqs/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/application/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/replacement-options/"}] | [{"label":"Official program","url":"https://www.nycctp.com/available-funding/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/faqs/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/application/"},{"label":"Eligibility and program rules","url":"https://www.nycctp.com/replacement-options/"},{"label":"Participating vendors","url":"https://www.nycctp.com/participating-vendors/"},{"label":"New York application (April 2026)","url":"https://cdn.nycctp.com/downloads/nycctp_app_development_mta_new_york.pdf"},{"label":"New Jersey application (April 2026)","url":"https://cdn.nycctp.com/downloads/nycctp_app_development_mta_new_jersey.pdf"}] |
| notes | "Program FAQ contains apparent copy errors in NY small-fleet and large-fleet headings. Application page clearly confirms BEV small-fleet scrappage exception and large-fleet requirement. Boundaries and operating patterns matter; county matching is preliminary. Do not duplicate this one award if displayed under both NY and NJ." | "Program FAQ contains apparent copy errors in NY small-fleet and large-fleet headings. Application page clearly confirms BEV small-fleet scrappage exception and large-fleet requirement. Boundaries and operating patterns matter; county matching is preliminary. Do not duplicate this one award if displayed under both NY and NJ. Tesla is listed as a vendor, but exact model/REL transaction still requires confirmation. Source conflict: funding webpage applies 75% invoice/base comparison then adds bonuses; April 2026 forms compare 75% invoice against total incentive. Forms also prohibit combining incentives more broadly than FAQ NJ-specific prohibition. Confirm amount calculation and stacking before quoting. Both forms require pre-order approval and 60-day invoice; NY nine-month delivery starts at approval, NJ at submittal. Confirm applicable trigger." |
Driving a Cleaner Illinois — Volkswagen Round 9 Electric TrucksChecked — unchanged
Re-read current notice, September 10, 2025 Round 9 NOFO and application. Published rules remain unchanged. Owner-applicant and Tesla/REL transaction confirmation remains expressly unresolved in the existing record; no model approval is inferred. Five-year post-completion certifications can outlast a four-year lease; grant agreement controls project timing. The $18 million allocation and $100,000 minimum award are not per-truck rebate caps.
Scope: full program review
DieselWise Indiana — 2025 Diesel Replacement GrantsChecked — unchanged
Re-read current IDEM page and 22-page 2025 RFP including material vehicle, cost-share, timing, scrappage and reporting provisions. This verifies the cataloged CLOSED historical round only; not a new solicitation or Tesla-specific approval. Explicit lease, lease-to-own and installment exclusions remain. The September 30, 2026 completion date has passed. Individual award expectation up to $250,000 is not a per-truck cap; reporting is governed by the cooperative agreement.
Scope: full program review
Missouri VW Trust — DERA Truck Replacement OptionChecked — unchanged
Re-read current DERA status, June 2024 implementation guidelines and full 11-page program requirements. Requirements PDF was retrieved directly from the official host and read locally after the web tool failed. Closed historical rules remain, including lease exclusion and unestablished Tesla-specific fit. The anticipated late-2026/early-2027 reopening is not a definite opening. Five-year records retention and project documentation were reviewed. Historical project period ended September 30, 2026; future solicitation requires new review.
Scope: full program review
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementReview needed
Monthly material-rule research remains incomplete for publication: October 26, 2026 intake is advertised, but webpage says 5 p.m. CST and guidance says 5 p.m. CDT. Preserve prior facts and verification dates. Reviewed Class 8 award, ownership, Iowa-operation, lease exclusion, procurement, scrappage, cost share and reporting; no Tesla-specific approval established. Exact cutoff and transaction/model confirmation remain unresolved, so no full verification is claimed. Agreement expected January 2027; projects must complete December 31, 2030; semiannual/final reports and reimbursement within one month follow program rules.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
ComEd — Business and Public Sector Class 8 EV Rebates (2026)Review needed
Monthly material-rule research remains incomplete for publication. Re-read May 20, 2026 terms across all material fields, but main ComEd program page again returned zero content. ChooseEV vehicle-specific notice still says all new reservation and post-purchase applications waitlisted; current utility corroboration/authority not established, so keep status verify and all prior dates. No inference of closure. Terms establish 36-month leases/retention, but current Tesla/vendor acceptance and REL customer/third-party role require administrator confirmation. Point-of-sale uses participating dealers; post-purchase must be submitted/signed by recipient. Keep this distinct from make-ready closure.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
Texas Volkswagen Environmental Mitigation Program — All-ElectricVerified change
Targeted material-rules clarification, not a full-rule verification. Current RFGA §4.7(c) distinguishes recordkeeping and random audits from annual usage reports. Addendum 5 dated August 31, 2026 supplies the new-award reimbursement deadline. Applicant/lessee and Tesla configuration/vendor approval remain unconfirmed; preserve prior full verification date and REL fit. No amount change. Independent review also identified the explicit grantee-ownership and funding-intermediary restrictions, now surfaced without deciding REL eligibility.
Scope: program status, qualification requirements · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| qualification requirements | ["Nongovernmental applicants: up to 75% incremental cost, limited by the official grant table; amount depends on the project.","Replace and destroy an eligible operational diesel truck with a 1992–2009 engine; historical ownership/use requirements apply.","New truck must serve the same vehicle type and use. Tesla configuration and REL ownership/lease structure need TCEQ confirmation.","At least 51% annual operation in one designated priority area; five-year activity life and reporting.","First-come applications through August 31, 2029, unless funding ends or the program is suspended.","Purchasing before the signed grant contract is at applicant risk; qualifying cost and reimbursement deadlines govern.","Other incentives reduce incremental eligible cost; do not add awards at face value.","Four-year REL leases require special review against the five-year program commitment."] | ["Nongovernmental applicants: up to 75% incremental cost, limited by the official grant table; amount depends on the project.","Replace and destroy an eligible operational diesel truck with a 1992–2009 engine; historical ownership/use requirements apply.","New truck must serve the same vehicle type and use. The grantee must own the funded equipment throughout the five-year activity life. Entities acting as third-party funding intermediaries that pass grant funding or cost savings to vehicle owners/operators are excluded; TCEQ must confirm how these restrictions apply to REL’s ownership/lease structure and the Tesla configuration.","At least 51% annual operation in one designated priority area; five-year activity life from final reimbursement. Maintain usage/location records for possible random audit; routine annual usage reports are not required.","First-come applications through August 31, 2029, unless funding ends or the program is suspended.","Purchasing before the signed grant contract is at applicant risk. For new awards after Addendum 5, reimbursement is due by the earlier of 24 months after contract execution or August 31, 2032.","Other incentives reduce incremental eligible cost; do not add awards at face value.","Four-year REL leases require special review against the five-year program commitment."] |
Texas TERP Rebate Grants — New Zero-Emission TrucksChecked — unchanged
Targeted reread of FY2026 RFGA, amount tables and current closed page. Class 8 zero-emission caps remain $102,000 at 55% eligible-area use and $150,000 at 80%, limited by incremental cost. No scrappage for the new-purchase path. Five-year activity life and sufficient lease/binding purchase requirements remain. Tesla-specific configuration/vendor/REL transaction confirmation and complete ancillary guidance review are outstanding; no full-rule date refresh.
Scope: program status, base incentive, maximum incentive, award amount, lease, combining incentives, requires scrappage
Texas Seaport and Rail Yard Areas Emissions Reduction (SPRY)Checked — unchanged
Targeted current RFGA reread confirms finance-lease restriction, five-year activity life, 200 days/year at eligible facilities and at least 50% eligible-county operation. Four-year ordinary REL leases do not satisfy the purchase commitment. Tesla/vendor confirmation and complete incorporated guidance remain unresolved; no full-rule date refresh.
Scope: program status, lease, combining incentives, award amount, requires scrappage
Texas Clean Fleet Program (TCFP)Checked — unchanged
Targeted check of current directory plus historical FY2025 RFGA. January 2027 remains only a projected opening; intake currently closed. Prior 75-vehicle fleet/10 replacements, 75% Texas and 25% CTZ use, lease-purchase and scrappage rules reread. Next-round rules, Tesla configuration/vendor fit, and REL applicability not established; no full-rule date refresh.
Scope: program status, lease, combining incentives, award amount, requires scrappage
Oklahoma Volkswagen On-Road ProgramChecked — unchanged
Targeted reread of closed On-Road2 solicitation: 75% private electric replacement, five-year Oklahoma operation, 60-day scrappage and new-unit documentation, semiannual project reports and five-year record retention. Current program page still rejects new projects. Lease/Tesla/vendor eligibility remains unresolved; no full-rule date refresh.
Scope: program status, award amount, combining incentives, requires scrappage
Arkansas Go RED! — Electric Truck ReplacementReview needed
Conflicting official intake notices: grants directory describes monthly rolling applications through November 30, 2026 or exhaustion, but detailed Go RED page says applications are paused and would reopen October 1, 2026 only if funding remained. Actual reopening not confirmed. Linked guide states effective July 1, 2026 on contents page despite draft cover placeholder; lease prohibition, 45% zero-emission replacement rate and $500,000 per-applicant cap remain unchanged. Full verification withheld pending current intake and model/vendor scope reconciliation. Preserve prior facts and dates; display exception, not assumed open/closed.
Scope: program status, award amount, lease, combining incentives, qualification requirements
Alabama Volkswagen Settlement — 2026 Truck ReplacementsReview needed
Urgent: official current page confirms applications through October 6, 2026 at 11:59 p.m. Central. DOCX guide was directly downloaded and reread, but it does not resolve REL lessor/applicant eligibility, 4–7-year lease fit, Tesla configuration/vendor qualification, specific stacking, or complete post-award retention obligations. Public page uses Central while guide says CST; preserve date as local Central without scheduling a future closure event. Prior facts and dates preserved; no full-rule verification claimed.
Scope: program status, award amount, qualification requirements, lease, combining incentives
Mississippi Volkswagen Environmental Mitigation — TrucksReview needed
Monthly reread of MDEQ page and 2021 application confirms historical private electric rate 60% (not higher Trust appendix rate), scrappage and agreement-before-work. Current page still forecasts a second round in late 2024/2025. Current funding, lease/Tesla/vendor fit, 4–7-year term and current retention/reporting/stacking requirements remain unresolved. Preserve verify status and prior facts/dates; no closure inferred.
Scope: program status, award amount, qualification requirements, lease, combining incentives
Tennessee VW Medium/Heavy-Duty Vehicles — Round 2Verified change
Targeted stacking clarification from current TDEC FAQ and Round 2 manual; it does not approve any particular incentive pairing. Closed August 21, 2026 at 4 p.m. Central remains unchanged. Titled-lessor/five-year Tennessee reporting pathway reconfirmed; a four-year lease needs eligible continuation. Full review remains incomplete because Tesla configuration/vendor confirmation and stale manual scheduling require transaction-specific reconciliation; prior full verification date preserved.
Scope: program status, lease, combining incentives · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| combining incentives | "General stacking permission was not established; disclose other assistance and obtain TDEC approval." | "External cost share must be disclosed with the funding source, expected decision timing, and fallback capital if denied. Confirmed contributions need funder documentation of amount and scope. The external funding program must permit combination with VW Trust funds; obtain approval for the specific pairing." |
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027Checked — unchanged
Material rule review: current portal closure and September 11 FOA funding table, lessor/applicant rules, Class 3–8 specification, fleet minimum, purchase sequence, Maryland operation, reporting, scoring and duplicate-funding provisions reread. Award is 75% of incremental cost; the $2.5m on-road individual grant limit is not a per-truck cap. Lease approval and Tesla configuration remain transaction-specific; no fixed minimum lease was established. FOA says leased vehicles should remain in state beyond the lease term; mandatory domicile/operation minimum is one year. Projects approximately 24 months after executed agreement; grant agreement governs reporting and current page links semiannual reports. This verifies published rules, not REL qualification. General Provisions reread: reimbursement requests within 60 days of project completion unless approved extension; records and site audit access at least three years after final reimbursement. No transfer of obligations without MEA written consent.
Scope: full program review
Port of Virginia GO-Zero — 2026Verified change
Full review of July 2, 2026 application plus current program, FAQ, dealer/manufacturer resources and stacking pages. Clarify the newly checked Tesla resource listing without converting it to approved model/vendor status. Existing closed round, $200,000 base/$25,000 optional bonus, owner-applicant, two-year/100-visits-per-year service, inspection/data sharing and prior-award purchase sequence remain. Carrier affiliation is not permission to lease the vehicle; 4–7-year lease acceptance remains unresolved. Informational clarification takes effect on publication; source has no publication/effective date.
Scope: full program review · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| Tesla model eligibility | "No Tesla-specific approval established; proposed model must be accepted by the program." | "Tesla Semi appears in the program’s general manufacturer resource list. That informational listing does not establish approval of a particular configuration or REL-owned lease; obtain program confirmation." |
Pennsylvania Alternative Fuels Incentive Grant — 2026Verified change
Full current page and 2026 guideline review. Add material existing-fleet reductions and application/applicant caps previously omitted from the display; maximum per-truck amount and ranking remain $100,000. Table 3 has an overlapping 75% boundary: do not calculate an award at that boundary without DEP clarification. Current program page explicitly closes 2026 and anticipates winter 2027, overriding the guideline’s originally scheduled October 7 intake. Registration retention, reporting, delivery window and leased-vehicle exclusion reread. No Tesla-specific eligibility inferred. These are clarifications of existing 2026 rules discovered now, applied at publication. Targeted scope preserves the prior full-rule verification date because Table 3 has an unresolved overlapping 75% boundary.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area, notes · Effective Oct 5, 2026
| Field | Previous | Published |
|---|---|---|
| qualification requirements | ["Eligible Pennsylvania businesses, local public entities and incorporated nonprofits; state/federal agencies are excluded.","New OEM BEV; Class 8 awards depend on battery capacity and incremental cost.","Pennsylvania registration, domicile and primary operation; registration retention is at least two years after project completion."] | ["Eligible Pennsylvania businesses, local public entities and incorporated nonprofits; state/federal agencies are excluded.","New OEM BEV; Class 8 awards depend on battery capacity and incremental cost.","Pennsylvania registration, domicile and primary operation; registration retention is at least two years after project completion.","Class 3–8 award caps are reduced according to the share of the applicant’s existing Pennsylvania fleet already using alternative fuels; apply the guideline’s Table 3 before estimating an award."] |
| notes | "The $100,000 ceiling requires more than 200 kWh and is limited by incremental cost. A future round may change terms." | "The $100,000 ceiling requires more than 200 kWh and is limited by incremental cost and existing-fleet reductions. Vehicle applications are capped at $300,000; an applicant and businesses under common ownership are capped at $500,000 per fiscal year. A future round may change terms. Table 3 contains overlapping categories at exactly 75% existing alternative-fuel fleet share; obtain DEP clarification before calculating an award at that boundary." |
Pennsylvania Freight Innovations in Transportation — 2025Checked — unchanged
Targeted material review of deadline, baseline percentage/bonus structure and explicit lease exclusion in current linked PA-FIT manual. Retain 45% baseline with approved cost-share credits, closed 2025 round, and ineligible REL leases. Full review incomplete: model/certification, all retention/reporting and extension/post-award dates were not completely reverified; preserve full-rule date. Current guideline Table 8 limits other grantees to 75% total after qualified credits; no guaranteed combined award inferred.
Scope: program status, award amount, lease, REL lease suitability, minimum lease term
New Mexico Clean Diesel Program — Electric Truck ReplacementChecked — unchanged
Targeted material review of current 2026 rolling intake, October 2025 guidance’s private-entity, old-vehicle ownership/life, cost, lease and funding restrictions. Lease exclusion remains explicit. Full review incomplete: detailed 75% operation documentation, complete model/vendor and post-award retention/reporting scope not re-established; full-rule date preserved.
Scope: program status, base incentive, maximum incentive, award amount, lease, minimum lease term, REL lease suitability, combining incentives
Montana Clean Truck, Bus & Airport Equipment — TrucksChecked — unchanged
Material RFA review covers awards, geography, replacement/scrappage, purchase sequence, matches and dated closure. Retain closed January 30, 2026 round. Full review incomplete: final eMACS addenda, definitive lease acceptance/model-specific approval and full post-award reporting not independently established. Five-year operation is not a verified lease minimum; $500,000 remains a project cap, not a ranked truck award.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, combining incentives, locations, operating area
Kansas Clean Vehicles — Class 8 Truck ReplacementReview needed
Targeted material review of available 2026 RFA pages: Class 8 table, new-vehicle/vendor rules, 75% mileage, funding, records and closure. Remaining RFA text retrieval repeatedly failed (including lease section) after initial successful read. Preserve existing explicit lease exclusion, other facts and full-rule date; do not treat this as full eligibility review. Five-year financial records and useful-life use/maintenance records appear in readable part; $150,000 is per truck, unlike the $2m applicant/project maximum. Independent reviewer could not reopen the administrator page or RFA (403); prior facts and verification dates retained, with no verification refresh.
Scope: program status, base incentive, maximum incentive, award amount, operating area
Idaho Vehicle Replacement Program — Class 8Review needed
The guide initially failed but was recovered on final reopen. Confirmed expired September22 2025 intake,45% zero-emission cost share, two-year existing ownership, similar replacement and90-day scrappage; July15 2027 completion. Lease/model fit and full reporting/retention duties remain incompletely reviewed. Preserve prior facts and full verification date; no successor established.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
DC DRIVE — Diesel Reduction Incentives for Vehicle ElectrificationReview needed
Current page and launch announcement reread. Conflict persists: limited funds while available versus intake form forthcoming when applications open. Base up to 45%, Class 4–8 replacement, purchase-only, DC registration or more than 60% operation, prior coordination and scrappage are visible. Full grant agreement, enhancement amounts, retention/reporting, stacking and configuration rules were not available. Preserve verify status, lease exclusion and prior dates; do not approve REL leases.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
Hawaiʻi Diesel Replacement Rebate — Class 8Review needed
Current page, 2026 guide and live application reread. Overall rolling intake still through September 30, 2028, while application requires completion September 30, 2026, now past. Charging statements also conflict. Explicit lease exclusion preserved. No full-rule freshness or status update until timing is resolved; no model-specific approval inferred.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
South Carolina DERA State Grants — FY2024 solicitationReview needed
Current RFP, application materials and incorporated EPA guide reread. June 12, 2026 is a priority date, not unconditional closure; no remaining allocation or definitive intake confirmed. Explicit lease prohibition remains. Class 5–8 replacement, no expansion, 90-day scrappage, nonfederal match, quarterly/final reporting and pre-contract costs reviewed. Preserve prior facts/dates and visible availability exception. Model-specific verification remains unconfirmed.
Scope: program status, base incentive, maximum incentive, award amount, qualification requirements, lease, combining incentives, official sources, Tesla model eligibility, minimum lease term, REL lease suitability, locations, operating area
Discovery: Official watch sources and independent announcement searches attempted for all 50 states and DC. Every jurisdiction has a separately reviewed scoped finding. All 11 assigned existing programs and six jurisdictions researched. Two targeted unchanged, three targeted corrections and six exceptions. Full-rule dates retained where applicability gaps remain. SCAG discovery held from catalog due unresolved mileage requirement. No exhaustive local discovery claim. Eight assigned jurisdictions researched; all findings state actual source coverage and unresolved gaps. Only Connecticut reached comprehensive full-rule verification. Vermont recovered from initial source failures and is targeted, not full. NYTVIP model/lease and NYC vendor updates are targeted; NYC amount/stacking conflicts remain explicit. 11/11 assigned jurisdictions searched using stored watch URLs plus independent official announcement queries. Five cataloged programs re-read: three proposed full unchanged verifications (IL VW, IN historical, MO historical); two targeted exceptions (IA deadline, ComEd funding/model/vendor). No factual edits or additions proposed. Local/utility inventory not exhaustive. Research candidates require separate read-only source review. Separate review prompted fresh reopens and corrected WI federal-DERA lead and MI closure header; both retained needs_review, with actual later research timestamps. Nine programs reread across ten jurisdictions. Targeted checks only; no full-rule date refresh because model/vendor/REL transaction or incorporated-rule gaps remain. Two proposed clarifications, four unchanged targeted checks and three unresolved program checks. State discovery performed for all ten with LA/MS/AR/KY unresolved scope noted. No new fully verified program proposed. Fresh direct sources attempted for all 16 assigned jurisdictions and 11 programs; material manuals accessed for 10 of 11, with Idaho guide unavailable and Kansas later-page extraction failures. Candidate full review MD, PA-AFIG, VA; targeted unchanged PA-FIT, NM, MT, KS; unresolved DC, SC, HI, ID. State findings distinguish readable scope from gaps. No new program met full addition gate. All candidates await independent source reopen/review. Failed sources and unresolved leads are gaps, not evidence of no programs. Local/port/utility discovery is targeted, not exhaustive. No future-effective event was scheduled where cutoff time or rules remained ambiguous.
Oct 1, 2026 · Funding check
42 programs checkedWeekly funding/deadline watch: all 42 cataloged programs attempted, including closed and lease-excluded records. 31 unchanged status checks independently confirmed; 1 factual change (Maryland open to closed after September 29 deadline); 10 exceptions preserve prior facts and dates. Alabama deadline October 6 at 11:59 p.m. Central; Rhode Island unresolved lead deadline October 2. No full eligibility review or statewide discovery-date refresh.
California Clean Fuel Reward — Class 8Checked — unchanged
Targeted funding-status check only. No full eligibility, live remaining balance, individual vehicle approval or REL transaction approval is implied.
Scope: funding status only
California HVIP — Standard Truck VouchersChecked — unchanged
Closed status unchanged. Year-end reopening remains a target, not a dated event. Reopened manual sections K.1 and M still differ on out-of-state Class 8 versus leased-vehicle operation; the prior lease/mileage exception remains unresolved. This check verifies status only.
Scope: funding status only
NJ ZIP — Phase 3Checked — unchanged
Specific closure notice controls over older generic rolling-application instructions. Closed status unchanged; no confirmed reopening in this page.
Scope: funding status only
New York Truck Voucher Incentive ProgramChecked — unchanged
Class 3–8 closure unchanged. Non-road and transit categories are separate and do not establish Class 8 truck reopening.
Scope: funding status only
San Diego Portside Zero-Emission Truck PilotChecked — unchanged
Intake remains open for the Portside pilot; no live balance asserted and no operating/lease requirements reverified.
Scope: funding status only
NYC Clean Trucks ProgramChecked — unchanged
Initial application-page retrieval failed but a subsequent direct read succeeded. Intake remains open; no remaining balance or Tesla approval asserted.
Scope: funding status only
Washington Zero-Emission Incentive Program (WAZIP)Checked — unchanged
Open status unchanged. Funding page dated September 15 says initial category allocations apply through October 2026; no replacement allocation or exact change date established, so no future event scheduled.
Scope: funding status only
Zero-Emissions Rebates for Oregon FleetsChecked — unchanged
Class 8 intake remains available. The Class 3 closure is not generalized. Existing third-party lease caution retained; no full-rule review.
Scope: funding status only
Texas Volkswagen Environmental Mitigation Program — All-ElectricChecked — unchanged
Status and published deadline checked; unchanged. Government-only fuel expansion does not establish new private-fleet eligibility.
Scope: funding status only
Driving a Cleaner Illinois — Volkswagen Round 9 Electric TrucksChecked — unchanged
Round 9 remains open. The separate DERA closure and charging round do not govern this record; allocation is not represented as a current remaining balance.
Scope: funding status only
California HVIP — Drayage Truck Set-AsideChecked — unchanged
Drayage funding unchanged. Existing leasing-company base-only limitation and operating-condition review remain; no full eligibility refresh.
Scope: funding status only
Oregon Diesel Emissions Mitigation Grants — Class 8 ReplacementChecked — unchanged
Published estimated October 21 deadline is unchanged and remains subject to DEQ timing/funding updates. Open status and October 21 deadline unchanged. Separate Clean Truck program only hopes to reopen in 2027; no exact future effective event supported.
Scope: funding status only
Washington Diesel Reduction Combined Funding — Local FreightChecked — unchanged
Open status and December 10 deadline unchanged. Existing owner/lease and local-freight constraints are retained.
Scope: funding status only
New Mexico Clean Diesel Program — Electric Truck ReplacementChecked — unchanged
Intake remains open. Published leased-vehicle exclusion stays explicit; this is not an available REL lease incentive.
Scope: funding status only
Nevada Diesel Emission Mitigation Fund — Truck ReplacementChecked — unchanged
Closed status unchanged. Historical lease exclusions preserved; a future-opening promise without a date is not a scheduled opening.
Scope: funding status only
California Innovative Small E-Fleet (ISEF)Review needed
REL provider participation and current ISEF allocation remain unconfirmed. Provider directory and funding page reviewed; no source-backed resolution of REL fit. CARB page returned an unreadable three-line response; do not infer closure.
Scope: program status, REL lease suitability
MOR-EV Trucks — Class 8Review needed
Keep existing amount/model exception. Current block table and eligible-model list still differ; Tesla Semi is not listed in the Class 8 rows read. No amount or Tesla eligibility change approved.
Scope: program status, award amount, Tesla model eligibility
Ports of Los Angeles and Long Beach — HVIP Drayage Plus UpReview needed
Current port reservations remain unconfirmed; preserve verify status and leasing-company purchaser exclusion. No factual patch approved.
Scope: funding status only
Connecticut VW Diesel Emissions Mitigation — Round 4Checked — unchanged
Targeted weekly status/deadline review only. DEEP continues to list the June 11, 2026 Round 4 deadline, now past; no Round 4 extension or reopening appeared on the directly read program page. Generic October DERA reference was followed: the linked DERA page says 2025-2026 funding has not yet been made available. This is not a statewide discovery or full eligibility review. Existing closed status retained.
Scope: funding status only
Vermont VW Environmental Mitigation Trust — 2026 Electric TrucksCould not verify
Current official registry page timed out repeatedly; linked August Q&A PDF was inaccessible. DEC current RFA page returned 403, and direct public registry download returned 502. Search snippets suggest a December 31 rolling window but are not publication evidence. Preserve prior open status and all verification dates; current availability, funding updates and October submission calendar remain unverified.
Scope: funding status only
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027Verified change
MEA explicitly marks online submission and portal closed to new applications. The published deadline was September 29, 2026 at 3 p.m. Eastern (19:00 UTC). Publish the discovered closure now; do not backdate publication or refresh full eligibility. No eligibility or award changes claimed. The linked September 11 FOA was inaccessible in this run, but the current official portal-status page directly establishes closure.
Scope: program status, summary · Effective Oct 1, 2026
| Field | Previous | Published |
|---|---|---|
| program status | "open" | "closed" |
| summary | "Applications close September 29, 2026 at 3 p.m. Eastern; competitive vehicle funding includes Class 8." | "Applications closed September 29, 2026 at 3 p.m. Eastern. MEA confirms the FY2027 portal is closed to new applications." |
Pennsylvania Alternative Fuels Incentive Grant — 2026Checked — unchanged
Targeted weekly status and announced reopening check. Official DEP page still explicitly says AFIG 2026 is closed and anticipates winter 2027 reopening. No firm reopening instant is published, so no future-effective event is proposed. No broader eligibility review.
Scope: funding status only
Port of Virginia GO-Zero — 2026Checked — unchanged
Targeted weekly status check. Official GO-Zero page still advertises the dated July 10-August 24, 2026 window; its end is past. Checked linked announcements page, which contains 2023/2021 Green Operator updates, not a new GO-Zero window. Retain closed status; no universal claim that no future funding exists.
Scope: funding status only
Tennessee VW Medium/Heavy-Duty Vehicles — Round 2Checked — unchanged
Targeted weekly status/deadline review. TDEC Round 2 page retains August 21, 2026 at 4 p.m. Central deadline. No later Round 2 extension or reopening appeared in the read page. The older award announcement and Round 1 FAQ are not treated as new Round 2 funding or eligibility changes.
Scope: funding status only
Pennsylvania Freight Innovations in Transportation — 2025Checked — unchanged
Targeted weekly status check of cataloged 2025 PA-FIT round. Reopened DEP extension notice confirms December 19, 2025 deadline; current Driving PA Forward landing page and targeted announcement search yielded no directly verified replacement round. Storymap link could not be resolved by web tool. Closed 2025 round retained within this source scope; leased-vehicle exclusion remains intact and was not re-reviewed.
Scope: funding status only
South Carolina DERA State Grants — FY2024 solicitationReview needed
Current application-materials page and linked FY2024 RFP remain available. RFP makes June 12, 2026 a primary-consideration deadline, not a definitive closure: later applications may be considered only if funding is available. No current uncommitted balance or definite intake status was established. Preserve status verify, prior verification dates, and explicit leased-vehicle exclusion; not a full eligibility review.
Scope: funding status only
DC DRIVE — Diesel Reduction Incentives for Vehicle ElectrificationReview needed
Current official DC DRIVE page still describes limited funds while available, but says its intake form will be available when applications open. That does not resolve current intake availability. Preserve status verify and prior verification dates. Purchase-only wording remains on the page; existing leased-vehicle exclusion is preserved. No model or award enhancement resolution claimed.
Scope: funding status only
Alabama Volkswagen Settlement — 2026 Truck ReplacementsChecked — unchanged
Near deadline: ADECA directly confirms applications remain accepted until October 6, 2026, 11:59 p.m. Central (October 7 at 04:59 UTC). This is a targeted weekly status/deadline check; REL owner/applicant and lease fit remain unresolved. The existing deadline and open status are unchanged.
Scope: funding status only
Hawaiʻi Diesel Replacement Rebate — Class 8Review needed
Current intake banner still explicitly extends through September 30, 2028 or fund exhaustion, but the live application still requires project completion September 30, 2026 (now past). Preserve open status, existing lease prohibition and all dates; obtain administrator resolution of completion timing before a transaction. This targeted check does not reverify eligibility or charging rules.
Scope: funding status only
Idaho Vehicle Replacement Program — Class 8Checked — unchanged
2025 round remains past its September 22, 2025 submission deadline. The stale open wording refers expressly to that 2025 round; no successor intake announcement appeared in the program page and targeted official search. Closed status retained for this cataloged round; not a statewide no-program finding.
Scope: funding status only
Montana Clean Truck, Bus & Airport Equipment — TrucksChecked — unchanged
Cataloged 2025/26 round remains closed under its January 30, 2026 final deadline. Reopened current DEQ program page and RFA, and searched relevant official announcements; no successor intake was established. Prior eMACS-addenda limitation remains. No full-rule review.
Scope: funding status only
Kansas Clean Vehicles — Class 8 Truck ReplacementChecked — unchanged
Retain closed status: current administrator notice still specifies May 11, 2026 for the 2026 solicitation. Targeted official announcement search did not establish another round. Existing explicit leased-vehicle exclusion is preserved; this is not a new eligibility review.
Scope: funding status only
ComEd — Business and Public Sector Class 8 EV Rebates (2026)Review needed
ComEd primary program URL returned an empty response twice. Readable May 20 terms end December 31, 2026 or earlier exhaustion, but cannot establish remaining funding. A directly read ComEd-branded ChooseEV page (https://comed.chooseev.com/commercial/promos/) says all new vehicle applications enter a waitlist; retain as a material lead pending confirmed official authority/current-program corroboration. Do not confuse that vehicle waitlist with the separate make-ready program closure on the same page. Preserve facts and dates; no availability promise.
Scope: funding status only
DieselWise Indiana — 2025 Diesel Replacement GrantsChecked — unchanged
Current IDEM page continues linking the 2025 RFP; direct PDF confirms February 28, 2025 submission deadline. Targeted official search did not establish reopening. Historical project completion date September 30, 2026 is not a new application window. Existing lease and lease-to-own exclusions remain.
Scope: funding status only
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementReview needed
Intake remains advertised through October 26, 2026 (25 days away). The current webpage says 5 p.m. CST, while linked Cycle 4 guidance says 5 p.m. CDT. Preserve open status and prior verification dates; exact cutoff timezone remains an existing unresolved exception. Leased vehicles remain explicitly excluded in the catalog; this funding check does not reverify full rules.
Scope: funding status only
Missouri VW Trust — DERA Truck Replacement OptionChecked — unchanged
Current official page still says closed and anticipates another period in late 2026 or early 2027; neither a firm opening date nor an open new round is announced. Retain closed status, prior-round amounts and explicit leasing exclusion.
Scope: funding status only
Texas TERP Rebate Grants — New Zero-Emission TrucksChecked — unchanged
Current page expressly remains closed, with forms for reference only. The TERP directory (updated September 30, 2026) does not announce a new Rebate opening. Preserve historical new-purchase terms; no current award claimed.
Scope: funding status only
Texas Seaport and Rail Yard Areas Emissions Reduction (SPRY)Checked — unchanged
Still accepting first-come applications through March 12, 2027 at 5 p.m. Central while funds remain. No announced status/deadline change found on current page or TERP directory. Preserve the binding lease-purchase and third-party pass-through restrictions already recorded.
Scope: funding status only
Texas Clean Fleet Program (TCFP)Checked — unchanged
Upcoming status is unchanged: program page remains closed, while the September 30 directory still projects January 2027. Forecast is expressly subject to change; no exact future activation or new-round terms published. Preserve prior binding lease-purchase limitation.
Scope: funding status only
Oklahoma Volkswagen On-Road ProgramChecked — unchanged
Current administrator page expressly says new projects are not being accepted. No reopening notice appears on this targeted program page; historical round and unconfirmed REL lease fit preserved.
Scope: funding status only
Arkansas Go RED! — Electric Truck ReplacementChecked — unchanged
Rolling intake continues until funds are awarded or November 30, 2026. Under the published last-day-of-month schedule, the next deadline is October 31, 2026. Existing leased-vehicle prohibition and per-applicant (not per-truck) cap remain unchanged. No full eligibility review.
Scope: funding status only
Mississippi Volkswagen Environmental Mitigation — TrucksReview needed
Round 1 historical closure is confirmed, but the current page still forecasts Round 2 in late 2024 or 2025 and supplies no current window. Targeted MDEQ announcement search did not resolve this stale forecast. Preserve verify status, prior facts and dates; no closure inferred from absent newer detail.
Scope: funding status only
Discovery: Limited to relevant official announcements, existing reopening forecasts and unresolved leads. No broader nationwide discovery performed; all 51 historical jurisdiction findings and dates are unchanged. RI and ComEd remain leads, not new approved program facts. No pending future-effective events existed in the complete prior log. Forecasts lacking definite effective times were not scheduled.
Sep 24, 2026 · Correction
2 programs checkedClarified Iowa’s per-vehicle cap and Maryland’s purchase preference after the output audit. Location matching and results counts were corrected in the same Site release.
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementVerified change
Correct the cap unit in the amount rule and research notes; retain the explicit REL lease exclusion. Existing program status and other eligibility terms were not refreshed.
Scope: award amount, notes · Effective Sep 24, 2026
| Field | Previous | Published |
|---|---|---|
| award amount | "50% of eligible Class 8 truck cost, capped at $250,000" | "50% of eligible Class 8 truck cost, capped at $250,000 per vehicle" |
| notes | "Tesla-specific approval is not stated. Funding is competitive. Website deadline timezone wording differs from the guidance; confirm time with Iowa DOT. The verified $250,000 project cap is retained in the label; no REL lease benefit is ranked because leases are excluded." | "Tesla-specific approval is not stated. Funding is competitive. Website deadline timezone wording differs from the guidance; confirm time with Iowa DOT. The verified $250,000 per-vehicle cap is retained in the label; no REL lease benefit is ranked because leases are excluded." |
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027Verified change
Add the competitive purchase preference to the visible lease explanation. Existing amount and application status were not refreshed.
Scope: lease · Effective Sep 24, 2026
| Field | Previous | Published |
|---|---|---|
| lease | "Third-party purchase for leasing is expressly allowed. Submit the master lease and maintenance/warranty terms. No minimum lease term was established in the reviewed rules; REL’s 4–7-year structure needs MEA approval." | "Third-party purchase for leasing is expressly allowed. Submit the master lease and maintenance/warranty terms. No minimum lease term was established in the reviewed rules; REL’s 4–7-year structure needs MEA approval. Competitive scoring favors purchases over leases: 12 of 100 points are allocated to purchased vehicles." |
Discovery: Targeted corrections authorized by Casey after the read-only audit; no new-program or nationwide discovery performed.
Sep 24, 2026 · Correction
1 programs checkedNational source review identified conflicting HVIP operating requirements for leased Class 8 trucks. Existing rules remain visible with an explicit qualification warning; the verified leasing-base amount clarification remains in place.
California HVIP — Standard Truck VouchersReview needed
REL lease operation needs review: HVIP permits up to 50% out-of-state mileage for Class 8 goods traveling to or from California, but its three-year-plus lease section requires 100% California operation. Obtain CARB confirmation before treating interstate REL lease use as eligible.
Scope: qualification requirements, operating area, lease
Discovery: Targeted exception from national guideline review; no additional discovery in this correction.
Sep 24, 2026 · National rollout
7 programs checkedNational rollout: 7 source-reviewed program records added in the midatlantic research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
Maryland Medium- and Heavy-Duty ZEV Grant — FY2027New program
Directly read FOA eligibility, funding, lease, timing, geographic and duplication provisions; project-level grant limits are not displayed as truck caps.
Scope: full program review · Effective Sep 24, 2026
DC DRIVE — Diesel Reduction Incentives for Vehicle ElectrificationNew program
Verified purchase-only prohibition. Status deliberately verify because current intake is internally ambiguous.
Scope: full program review · Effective Sep 24, 2026
Pennsylvania Alternative Fuels Incentive Grant — 2026New program
Read vehicle funding table and leased-vehicle definition. Do not present the financing exception as permission for REL-owned leases.
Scope: full program review · Effective Sep 24, 2026
Pennsylvania Freight Innovations in Transportation — 2025New program
Closed replacement program worth monitoring. Read relevant Class 5–8, funding, ownership, geography, duplication, destruction and completion rules; no lease approval inferred. Corrected after independent review: directly read §25 leasing prohibition.
Scope: full program review · Effective Sep 24, 2026
Port of Virginia GO-Zero — 2026New program
Used July 2026 application, not older 2024 application. Optional scrappage correctly distinguished from base award.
Scope: full program review · Effective Sep 24, 2026
South Carolina DERA State Grants — FY2024 solicitationNew program
Status verify: priority deadline is not a hard closure, but remaining funds were not confirmed. RFP and pertinent federal replacement/cost-share/ownership provisions directly read. Corrected after independent review: directly read §25 leasing prohibition.
Scope: full program review · Effective Sep 24, 2026
Tennessee VW Medium/Heavy-Duty Vehicles — Round 2New program
Five years is an operation/reporting commitment, not a verified minimum single-lease term. Private 50% share is separated from government rates.
Scope: full program review · Effective Sep 24, 2026
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · National rollout
7 programs checkedNational rollout: 7 source-reviewed program records added in the south research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
Texas TERP Rebate Grants — New Zero-Emission TrucksNew program
Separate no-scrappage path within the broader TERP Rebate program. The live September 2026 closed status supersedes the April 2026 launch. No Tesla-specific approval or lease benefit pass-through was established.
Scope: full program review · Effective Sep 24, 2026
Texas Seaport and Rail Yard Areas Emissions Reduction (SPRY)New program
FY2026 RFGA expressly excludes third-party pass-through applicants and limits leases to binding finance purchases. No universal Class 8 award or Tesla/REL approval established. No county-level address match alone establishes eligibility.
Scope: full program review · Effective Sep 24, 2026
Texas Clean Fleet Program (TCFP)New program
Upcoming status is based on the program directory forecast; program detail page remains closed. Amount and detailed rules are explicitly historical FY2025 screening information, not confirmed January 2027 terms. Tesla and REL approval unconfirmed.
Scope: full program review · Effective Sep 24, 2026
Oklahoma Volkswagen On-Road ProgramNew program
Current program page expressly says no new applications. Published prior terms retained for monitoring only. No Tesla-specific model list or REL lease permission verified.
Scope: full program review · Effective Sep 24, 2026
Arkansas Go RED! — Electric Truck ReplacementNew program
Directly reviewed 2026 guide §V.4 leasing prohibition and §VI cost shares/cap. Cap is per applicant; numeric per-truck amount and ranking left unknown. Cover includes draft placeholder text, but next page says effective July 1, 2026 and official page links it as the current guide.
Scope: full program review · Effective Sep 24, 2026
Alabama Volkswagen Settlement — 2026 Truck ReplacementsNew program
2026 guide downloaded directly from the ADECA link and DOCX text read. Private 75% derived from explicit 25% minimum match; no universal dollar award, Tesla listing, REL lease permission or minimum term established.
Scope: full program review · Effective Sep 24, 2026
Mississippi Volkswagen Environmental Mitigation — TrucksNew program
This is a monitoring record, not available funding. Page forecast is stale as of September 2026. Historical state reimbursement table intentionally used instead of higher Trust appendix maxima. Tesla and REL eligibility unverified.
Scope: full program review · Effective Sep 24, 2026
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · National rollout
7 programs checkedNational rollout: 6 source-reviewed program records added in the west research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
California HVIP — Drayage Truck Set-AsideNew program
Research proposal, pending independent evidence review. Unknown fields and caution language are deliberate; no blanket Tesla/REL eligibility is asserted.
Scope: full program review · Effective Sep 24, 2026
Ports of Los Angeles and Long Beach — HVIP Drayage Plus UpNew program
Corrected after independent reviewer national_midwest identified explicit lease-company exclusion on printed manual page 34; researcher independently reopened and confirmed this rule.
Scope: full program review · Effective Sep 24, 2026
Oregon Diesel Emissions Mitigation Grants — Class 8 ReplacementNew program
Research proposal, pending independent evidence review. Unknown fields and caution language are deliberate; no blanket Tesla/REL eligibility is asserted.
Scope: full program review · Effective Sep 24, 2026
Washington Diesel Reduction Combined Funding — Local FreightNew program
Research proposal, pending independent evidence review. Unknown fields and caution language are deliberate; no blanket Tesla/REL eligibility is asserted.
Scope: full program review · Effective Sep 24, 2026
Nevada Diesel Emission Mitigation Fund — Truck ReplacementNew program
Corrected following independent reviewer national_midwest finding. Researcher directly reopened full 2021 application and confirmed lease exclusion, Class 8 local freight/drayage restriction and historical conditions.
Scope: full program review · Effective Sep 24, 2026
New Mexico Clean Diesel Program — Electric Truck ReplacementNew program
Corrected after independent reviewer national_midwest identified lease exclusion; researcher independently downloaded official PDF and confirmed page 3. Exclusion is explicit and ranking remains zero.
Scope: full program review · Effective Sep 24, 2026
California HVIP — Standard Truck VouchersVerified change
Existing record already warns that REL cannot automatically claim the small-business amount. The manual is more explicit: leasing-company purchasers are base-only. Keep the $330,000 owner-purchase program maximum, but avoid using it as the REL lease ranking/headline unless purchaser designation is independently approved.
Scope: lease, displayed incentive, comparison amount · Effective Sep 24, 2026
| Field | Previous | Published |
|---|---|---|
| lease | "4–7 year leases fit the term length, subject to approval of the parties, benefits pass-through and operating obligations." | "Leasing-company purchasers are limited to the base voucher. Leases of at least three years must disclose and pass through the full voucher; REL's 4–7-year duration alone does not establish enhanced eligibility." |
| displayed incentive | "Up to $330,000" | "$120,000 base for leasing purchaser" |
| comparison amount | 330000 | 120000 |
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · National rollout
4 programs checkedNational rollout: 4 source-reviewed program records added in the midwest research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
ComEd — Business and Public Sector Class 8 EV Rebates (2026)New program
Directly read administrator sources and full truck-relevant guidance; independently review before integration.
Scope: full program review · Effective Sep 24, 2026
DieselWise Indiana — 2025 Diesel Replacement GrantsNew program
Directly read administrator sources and full truck-relevant guidance; independently review before integration.
Scope: full program review · Effective Sep 24, 2026
Iowa VW Settlement — Cycle 4 Freight Truck ReplacementNew program
Directly read administrator sources and full truck-relevant guidance; independently review before integration.
Scope: full program review · Effective Sep 24, 2026
Missouri VW Trust — DERA Truck Replacement OptionNew program
Directly read administrator sources and full truck-relevant guidance; independently review before integration.
Scope: full program review · Effective Sep 24, 2026
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · National rollout
4 programs checkedNational rollout: 4 source-reviewed program records added in the plains research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
Hawaiʻi Diesel Replacement Rebate — Class 8New program
A current private Class 8 purchase program, explicitly ineligible for REL leases. Main notice/guide extension establishes overall intake; older form completion language remains a disclosed project-level verification item.
Scope: full program review · Effective Sep 24, 2026
Idaho Vehicle Replacement Program — Class 8New program
Deadline-based closure; lease acceptance was not stated in the reviewed guide. Do not infer a two-year lease minimum from prior ownership.
Scope: full program review · Effective Sep 24, 2026
Montana Clean Truck, Bus & Airport Equipment — TrucksNew program
Closed based on posted final deadline. No assertion that an operational-retention requirement establishes a permitted lease. $500,000 is the project cap, not a guaranteed truck award.
Scope: full program review · Effective Sep 24, 2026
Kansas Clean Vehicles — Class 8 Truck ReplacementNew program
Closed acquisition program useful for monitoring; explicitly unsuitable for REL leases. Full RFA category is retained with the webpage summary omission disclosed.
Scope: full program review · Effective Sep 24, 2026
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · National rollout
2 programs checkedNational rollout: 2 source-reviewed program records added in the northeast research group. Lease restrictions, closed rounds and remaining qualification questions stay explicit. Existing records were not treated as fully re-reviewed by this discovery pass.
Connecticut VW Diesel Emissions Mitigation — Round 4New program
Directly read DEEP current grant page and downloaded DOCX application. Deadline has passed. Dollar fields remain null because funding is a percentage of approved costs; owner/lease transaction details remain review items.
Scope: full program review · Effective Sep 24, 2026
Vermont VW Environmental Mitigation Trust — 2026 Electric TrucksNew program
Directly downloaded 39-page RFA and seven-page August Q&A from official registry. DEC webpage itself 403. Open schedule and August funded awards supported by bid registry and addendum; no live balance asserted.
Scope: full program review · Effective Sep 24, 2026
Discovery: Jurisdiction findings and official watch sources were reviewed separately for every state in this research group; unresolved leads are retained for follow-up.
Sep 24, 2026 · Initial pilot
12 programs checkedInitial funding-status pilot: 12 existing programs checked. Ten published statuses reconfirmed; two existing eligibility/rule review flags retained. No incentive amounts or eligibility rules changed.
California Clean Fuel Reward — Class 8Checked — unchanged
Class 8 remains within the published commercial program. This status check does not confirm Tesla model approval or remaining balance.
Scope: funding status only
California HVIP — Standard Truck VouchersChecked — unchanged
Standard HVIP remains closed. Public Fleet and Drayage tracks are separate; a target reopening is not a confirmed reopening.
Scope: funding status only
NJ ZIP — Phase 3Checked — unchanged
The explicit Phase 3 closure notice controls despite older generic application instructions.
Scope: funding status only
New York Truck Voucher Incentive ProgramChecked — unchanged
Closure applies to the Class 3–8 funding group, including Class 8; other vehicle groups are separate.
Scope: funding status only
NYC Clean Trucks ProgramChecked — unchanged
Application and funding pages support current intake and Class 8 coverage. No live remaining balance is stated.
Scope: funding status only
Washington Zero-Emission Incentive Program (WAZIP)Checked — unchanged
Class 7–8 funding is listed. Model approval and REL transaction eligibility still require confirmation.
Scope: funding status only
Zero-Emissions Rebates for Oregon FleetsChecked — unchanged
Funding and application access remain available for Class 8. The stated Class 3 closure does not apply to this record. Published allocation is not a verified remaining balance.
Scope: funding status only
San Diego Portside Zero-Emission Truck PilotChecked — unchanged
The pilot remains open. Three-year lease reimbursement and Portside operating requirements remain separate qualifications.
Scope: funding status only
Texas Volkswagen Environmental Mitigation Program — All-ElectricChecked — unchanged
Intake remains open. The official page lists August 31, 2029, 5 p.m. CDT, unless suspended earlier. This check does not reverify all replacement or operating rules.
Scope: funding status only
Driving a Cleaner Illinois — Volkswagen Round 9 Electric TrucksChecked — unchanged
Current opportunities and Round 9 narrative support open intake for Class 4–8 replacement trucks. No live remaining balance is shown.
Scope: funding status only
California Innovative Small E-Fleet (ISEF)Review needed
Funding is reported available. REL’s approved-provider and small-fleet lease arrangement still needs confirmation; retain the broader program review flag. The exact remaining allocation is unverified.
Scope: program status, REL lease suitability
MOR-EV Trucks — Class 8Review needed
Funding is reported available. The main page shows a $76,500 Class 8 Block 2 amount, while eligible-vehicle rows show $90,000. Tesla Semi is absent from the Class 8 list. Retain the existing review flag and verify applicable amount and model approval before quoting.
Scope: program status, award amount, Tesla model eligibility
Discovery: Pilot limited to existing programs; nationwide discovery has not begun.